GENERAL NEW NOTES: MECHANICAL PLAN NOTES:
<br /> 1. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE AND BECOME FULLY ACQUAINTED WITHO MAKEUP AIR SUPPLY DUCT DOWN THROUGH ROOF, FROM MAKEUP AIR UNIT. GRILLE, REGISTER AND DIFFUSER SCHEDULE
<br /> THE EXISTING CONDITIONS OF THE PROJECT. REVIEW THE GENERAL NOTES, TRANSITION SUPPLY DUCT TO DUCT SIZE INDICATED ON PLAN AND ROUTE TO r ,
<br /> SPECIFICATIONS AND OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS WHICH MAY KITCHEN HOOD PERFORATED SUPPLY PANELS. MARK MANUFACTURER MODEL FACE MOUNTING FACE SIZE MAX. MAX. PRESS. NOTES U
<br /> NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION E N
<br /> DOCUMENTS, NOTIFY ARCHITECT, ENGINEER AND/OR OWNER OF CONFLICTS OR O EXISTING TO REMAIN SUPPLY AND RETURN AIR DUCT DROPS FROM ROOF TOP TYPE LOCATION IN NC DROP IN. W.C.
<br /> DISCREPANCIES PRIOR TO SUBMISSION OF BID. UNIT. ROUTE NEW SUPPLY AND RETURN AIR DUCTWORK ABOVE CEILING AS
<br /> CD-1 TITUS TMS CONE LAY-IN 24)0-4 30 0.05 A-E ^
<br /> fNDICATED ON MECHANICAL FLOOR PLAN. EXISTING TO REMAIN DUCT SMOKE co 8)CD-2 TITUS PAR CONE GYP. 12x12 30 0.05 A-E Z fI..L E
<br /> 2. COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER TRADES TO DETECTOR IN SUPPLY AIR DUCT. SMOKE DETECTOR TO SHUT DOWN UNIT cm N
<br /> ENSURE A NEAT AND ORDERLY INSTALLATION. INSTALL DUCTWORK AS TIGHT TO SUPPLY FAN UPON THE DETECTION OF SMOKE. BALANCE OUTSIDE AIR FLOW
<br /> STRUCTURE AS POSSIBLE. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS. TO CFM INDICATED ON OUTSIDE AIR SCHEDULE. CD-3 TITUS TMR ROUND DUCT 30 0.05 A-D O Q
<br /> COORDINATE INSTALLATION OF DUCTWORK TO AVOID CONFLICTS WITH ELECTRICAL U)
<br /> PANELS, LIGHTING FIXTURES, ETC. ANY MODIFICATIONS REQUIRED DUE TO LACK OF O GREASE EXHAUST DUCT TO EXHAUST RISER CONNECTION ON KITCHEN HOOP CD-4 TITUS TMS CANE GYP. 24x24 30 0.05 A-F Zcc 0
<br /> i I m
<br /> COORDINATION WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO EXTRA COST UP TO GREASE EXHAUST FAN ON ROOF. GREASE EXHAUST DUCT WORK RG1 TITUS 350FL LOWERED DUCT NECK+ 1-314 25 0.1 A,C,D � ��
<br /> TO THE OWNER. SHALL BE MINIMUM 16 GAUGE BLACK IRON WITH LIQUID TIGHT WELDS, WITH � U
<br /> ACCESS PANELS FOR GREASE CLEANING AS REQUIRED BY NFPA 96 AND RG-2 TITUS PAR PERFORATED LAY-IN 24X24 30 0.05 A-E _.,,I 1 f
<br /> i
<br /> 3. NEW MECHANICAL EQUIPMENT AND DUCTWORK ARE SHOWN AT APPROXIMATE LOCAL CODES. SLOPE DUCT BACK TOWARDS HOOD AT MINIMUM OF 1/4" PER W
<br /> LOCATIONS. FIELD MEASURE FINAL DUCTWORK LOCATIONS PRIOR TO FABRICATION AND LINEAL FOOT. GREASE DUCT SHALL WRAPPED WITH FIRE WRAP INSULATION rn
<br /> MAKE ADJUSTMENTS AS REQUIRED TO FIT THE DUCTWORK AND PIPING WITHIN THE PER DETAIL #10, SHEET M3, PROVIDE CLEANOUT ACCESS ON EVERY DUCT NOTES: v
<br /> AVAILABLE SPACE. VERIFY THAT FINAL EQUIPMENT LOCATIONS MEET MANUFACTURER'S TURN AND EVERY 12'-0" ON THE HORIZONTAL. REFER TO GREASE DUCT A. NECK SIZE SHOWN ON DRAWINGS. PROVIDE NECK FOR DUCT CONNECTION. > Z o
<br /> RECOMMENDATIONS REGARDING SERVICE CLEARANCE AND PROPER AIRFLOW �_ <D -0
<br /> CLEANOUT ACCESS DOOR, PER DETAIL #9, SHEET M3. B. 4-WAY THROW PATTERN UNLESS OTHERWISE SHOWN ON DRAWINGS.
<br /> CLEARANCE AROUND EQUIPMENT, r � �
<br /> 4. REFER TO ARCHITECTURAL DRAWINGS FOR RELATED CONSTRUCTION DETAILS AS
<br /> 0 LOCATION OF REMOTE MOUNT HOOD CONTROL PANEL. C. BRANCH DUCT SIZE SHALL BE SAME AS NECK SIZE UNLESS OTHERWISE SHOWN ON DRAWINGS. V T
<br /> APPLICABLE TO THE HVAC SYSTEM. VERIFY CHASES AND PENETRATIONS SHOWN ON OS TYPE I KITCHEN HOOD BY CAPTIVE-AIRF. REFER TO KITCHEN HOOP D. BAKED ENAMEL FINISH, WHITE TO MATCH CEILING COLOR 10�
<br /> ARCHITECTURAL DRAWINGS THAT ARE INTENDED FOR DUCTWORK AND PIPING MEET DRAWINGS. THE HOOD AND DUCT SHALL HAVE AN APPROVED FIRE E. FRAME TYPE TO MATCH CEILING CONSTRUCTION, COORDINATE WITH ARCHITECTURAL RCP. CD-1 i W
<br /> REQUIREMENTS. PROTECTION. THE FIRE--EXTINGUISHING SYSTEM SHALL BE INTERCONNECTED F. PROVIDE WITH OPPOSED BLADE DAMPER ACCESSIBLE FROM DIFFUSER FACE. 350
<br /> 5.
<br /> TO THE FUEL OR CURRENT SUPPLY SO THAT THE FUEL OR CURRENT SUPPLY 26x14 COORDINATE LOCATION OF ROOF MOUNTED HVAC EQUIPMENT AND ROOF IS AUTOMATICALLY SHUT OFF TO ALL EQUIPMENT UNDER THE HOOD WHEN r
<br /> PENETRATIONS WITH THE ARCHITECTURAL AND STRUCTURAL DRAWINGS. THE SYSTEM IS ACTUATED.
<br /> 6. / r
<br /> r
<br /> INDOOR AIR QUALITY MEASURES: PROTECT INSIDE OF {INSTALLED AND DELIVERED} O PERFORATED SUPPLY OPENINGS ON KITCHEN HOOD. PROVIDE SUPPLY DUCT OUTSIDE AIR REQUIREMENTS r
<br /> / r
<br /> DUCTWORK AND HVAC UNITS FROM EXPOSURE TO DUST, DIRT, PAINT AND MOISTURE. FROM KITCHEN HOOD SUPPLY RISER TO UP AIR DUCT, ROUTED ABOVE. REFER / r
<br /> REPLACE INSULATION THAT HAS GOTTEN WET AT ANY TIME DURING CONSTRUCTION, TO KITCHEN HOOD ELEVATION ON SHEET H1. AREA GROSS / r _
<br /> THIS DRAWING IS AN INSTRUMENT OF
<br /> DRYING THE INSULATION f5 NOT ACCEPTABLE. SEAL ANY TEARS OR JOINTS OF CODE OUTSIDE AIR SYSTEM ACTUAL rr _ lI _ sERVICEAr�onssuc�ISHA��REMAIN
<br /> INTERNAL FIBERGLASS INSULATION. REMOVE DEBRIS FROM CEILING RETURN AIR PURPOSE FLOOR / /' 120 12 x ERVICEANDAS UGH SHALL
<br /> DESIGN
<br /> / O7 CEILING MOUNTED RESTROOM EXHAUST FAN. PROVIDE 6"s� EXHAUST DUCT REQUIREMENTS NUMBER OUTSIDE AIR / CD-1 cRauPUC.uNAUrHORIZEDusEOF
<br /> PLENUM INCLUDING DUST. AN INDEPENDENT, PROFESSIONAL DUCT GLEANING UP TO ROOF CAP, COORDINATE LOCATION OF ROOF CAP TO MAINTAIN 10'-0" AREA �/ 500 2 x14 (n'P 2} CD-1 REPRODUCTION COMPANY SHALL VACUUM CLEAN ANY DUCTWORK CONNECTED TO HVAC UNITS THAT CFM PER UNI 50p aFrHEARcwlrEcrlsPRowlelrrEo.
<br /> CLEARANCE AWAY FROM ANY BUILDING INTAKES. (SQ. FT) CFM PER CFM CFM PER NO. OF CFM RTU-1 550 / rFTHEA CHITSING TISPRONLY ORUSEIN
<br /> WERE OPERATED DURING THE CONSTRUCTION PERIOD AFTER NEW FILTERS, MINIMUM / CONNECTiONWITHTHISPROJECTAND
<br /> MERV-8, ARE INSTALLED AND PRIOR TO TURNING SYSTEM OVER TO THE OWNER. OS RETURN AIR GRILLE MOUNTED TO THE RETURN AIR DUCT DROP, EXTEND SQ. FT READ. PERSON PEOPLE READ, RTU-2 55p CONNECT
<br /> NOT NWITH USED HISPFOR JECT
<br /> LOCATIONS.COPYRIGHT 2017.
<br /> UCT DOWN AS NECESSARY TO ACCOMMODATE HEIGHT OF RETURN GRILLE. DINING 770 0.15 116 15 48 720 / lox 7. INSTALL DUCTWORK PARALLEL TO BUILDING COLUMN LINES UNLESS OTHERWISE SHOWN FINISHED FLOOR. COOKING AREA 190 -15 T5 3 45_ - -99
<br /> OR NOTED, O DUCT MOUNTED SUPPLY DIFFUSER LOCATED NO HIGHER THAN 12'-0" ABOVE PREP/SERVICE 660 0. 11
<br /> -
<br /> 8. OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT, DUCTWORK SHALL BE i r
<br /> 22x1FASTENED TO
<br /> -- -- - - --------- --------
<br /> BUILDING JOISTS OR BEAMS. DO NOT ATTACH HANGERS AND SUPPORTS 1,620 TOTAL = 215 765 TOTAL = 1,100 CD �i I 5
<br /> TO THE ABOVE FLOOR SLAB OR ROOF EXCEPT WHERE CONCRETE INSERTS IN 4
<br /> CONCRETE SLABS ARE ALLOWED BY THE SPECIFICATIONS.
<br /> SD W
<br /> 9. COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF EQUIPMENT AIR BALANCE SCHEDULE 4 LLJ
<br /> ACCESS PANELS/DOORS TO ENABLE SERVICE OF EQUIPMENT AND/OR FILTER (TMP) -
<br /> REPLACEMENT.
<br /> EXHAUST AREA/EQUIPMENT 6AUST TOTALS ? n m
<br /> EXHi m
<br /> 10. SEAL PENETRATIONS THROUGH THE BUILDING COMPONENTS 1N ACCORDANCE WITH THE � ---
<br /> W 0)
<br /> EQUIPMENT SERVED (CFM) (CFM) On
<br /> CONTRACT SPECIFICATIONS. FIREPROOF PENETRATIONS THROUGH FIRE RATED _ �
<br /> Ln
<br /> COMPONENTS IN ACCORDANCE WITH U.L. REQUIREMENTS. KEF-1 KITCHEN HOOD 1800 3 18x16 3 14x12 EF O Q
<br /> 11. COORDINATE THE EXACT MOUNTING SIZE AND FRAME TYPE OF DIFFUSERS, REGISTERS KEF-2 KITCHEN HOOD 3050
<br /> 1 W V
<br /> AND GRILLES WITH THE SUPPLIER TO MEET THE CEILING, WALL AND DUCT INSTALLATION 7 V Q
<br /> REQUIREMENTS. 0 0 u
<br /> EF-1 RESTROOM 75 W U
<br /> 1 6 8x14 c
<br /> 12. ADJUST LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES AS REQUIRED TO EF-2 RESTROOM 1 cLu
<br /> ACCOMMODATE FINAL CEILING GRID AND LIGHTING LOCATIONS. F75 i____---__ z
<br /> ii ' I
<br /> 13. LOCATE AND SEC THERMOSTATS SENSORS AT LOCATIONS SHOWN ON PLANS. VERIFY 5,000 i - - � ; n _�`� T n 3 rr/ O O
<br /> EXACT LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION. INSTALL THERMOSTATS o II I I LI L F7 I 0 U
<br /> OUTDOOR AIR AREAIEQUIPMENT SUPPLY AIR DESIGN PERCENT o 0 0
<br /> WITH TOP OF DEVICE AT MAXIMUM 48" AFF TO MSEC ADA REQUIREMENTS UNLESS CP-2 O
<br /> NOTED OTHERWISE ON PLANS. INSTALL WIRING IN CONDUIT PROVIDED BY DIVISION 16. EQUIPMENT SERVED (CFM) OA (CFM) OAISA c- - w=� - � _ � 7� OZ
<br /> I ------ ----------- -------- r rl
<br /> ---- -- -
<br /> RTU-1(EXISTING) SPACE 3,000 550 18.3% i I
<br /> PROVIDE14. A MANUAL BALANCING DAMPER IN EACH BRANCH DUCT TAKEOFF FROM MAIN _ _
<br /> SUPPLY, RETURN, OUTDOOR AND EXHAUST AIR DUCTS. I ` - --- -- -----
<br /> RTU-2(EXISTING) SPACE 3,000 550 18.3% O 3 O O O
<br /> ; O ,
<br /> 15. PROVIDE A PREFABRICATED 45 DEGREE, HIGH EFFICIENCY, RECTANGULAR/ROUND 18x16 14x12 I
<br /> MAU-1 100 10 0 I
<br /> BRANCH DUCT TAKEOFF FITTING WITH MANUAL BALANCING DAMPER AND LOCKING KITCHEN 2,290 2,294 100.0% I CD-4 CD-4
<br /> QUADRANT FOR BRANCH DUCT CONNECTIONS AND TAKE-OFFS TO INDIVIDUAL
<br /> DIFFUSERS, REGISTERS AND GRILLES.
<br /> MAU-2 KITCHEN 1,800 1,800 100.0% i 425 425OD G
<br /> - /,
<br /> I _ _____ _ --------------------------------- ----- 100
<br /> 1 BRANCH DUCTWORK TO AIR OUTLETS SHALL BE SAME SIZE AS OUTLET NECK SIZE TOTAL AIRFLOW 10,090 5,190 51.4% 5,194 --____ O j; Cp-3
<br /> UNLESS OTHERWISE NOTED. L-� 250
<br /> 17. g ® ° ° ® a ,
<br /> RIGID DUCTWORK INSULATION: PROVIDE 3/4 LB DENSITY, 2-1/2" (R-8) THICK, INSULATION
<br /> TOTAL POSITIVE AIR FLOW 190 --------- �_ -�� -ww----_ �. -___WRAP _____-'
<br /> � I
<br /> N RIGID ROUND, CONCEALED, SUPPLY AND RETURN AIR DUCTS. PROVIDE 2" (R- r o c
<br /> /
<br /> 8) THICK 1-1/2 LB PERCENT POSITIVE AIR FLOW 3.7%DENSITY INTERNAL DUCT LINER ON RECTANGULAR SUPPLY AND � - �
<br /> RETURN AIR DUCTS. DUCT SIZES ON MECHANICAL PLANS INDICATE CLEAR INSIDEAIRFLOW - --_--,
<br /> I
<br /> DIMENSIONS, INCREASE SHEET METAL SIZES ACCORDINGLY. MAKEUP AIR UNIT SCHEDULE i0 I
<br /> 18. PROVIDE THERMAFLEX TYPE M-KE, FLEXMASTER TYPE 8, OR APPROVED EQUAL I II ® ® G G O
<br /> FLEXIBLE DUCTWORK. FLEXIBLE DUCTWORK SHALL BE LISTED UNDER UL 181 A5 CLASS 601 AIR DUCT AND BE PROVIDED WITH INTEGRAL R-8, 3/4 LB DENSITY FIBERGLASS MARK MANUFACTURER MODEL AREA SUPPLY FAN EVAPORATIVE COOLING ELECTRICAL WEIGHT NOTES L� CD-2 INSULATION. FLEXIBLE DUCTWORK SHALL NOT EXCEED 5'-0" IN LENGTH AND SHALL BE SERVED FAN CFM MIN. ESP CAP EAT LAT VIPH FLA LBS 75
<br /> INSTALLED AND SUPPORTED TO AVOID SHARP BENDS AND SAGGING, TYPE HP IN MBH DB/WB DB/W$ -- - - - ----_T -_ _ _ __ __� o o �
<br /> MAU-1 CAPTIVE-AIRF Al-15D KITCHEN FC 1800 1.50 0.5 40.8 95165 74165 20813 4.4 394 A,B i • - • i 132x20
<br /> 19, PROVIDE TYPE I GREASE HOOD EXHAUST DUCTWORK OF MINIMUM 16 GAUGE BLACK �T----- - �• I S I_ 1 RG-1O ds
<br /> IRON WITH LIQUID WELDS WITH ACCESS PANELS FOR GREASE CLEANING AS REQUIRED MAU-2 CAPTIVE AIRF Al-15D KITCHEN FC 2294 2.00 0.5 51.9 95165 74165 20813 6.1 480 A,C
<br /> BY NEPA 96 AND LOCAL CODES. DUCT SHALL BE WRAPPED IN TWO LAYERS OF 3M, 20A i i • • i • O Q
<br /> FIRE BARRIER DUCT WRAP. SLOPE DUCT BACK TOWARDS HOOD AT MINIMUM OF 1/4" 120
<br /> I -- _ ;
<br /> R LINEAR FOOT DUCT WRAP SYSTEM SHALL MEET UL REQUIREMENTS FOR GREASE NOTES: CD-3 EFi n.aFF 2 7 zi
<br /> DUCT ENCLOSURES. 00 A. REFER TO CAPTIVE-AIRE DRAWINGS FOR SPECIFICATIONS, SCHEDULE SHOWN FOR REFERENCE ONLY I 0 120 W 20 Rru-2 u
<br /> B. INTERLOCK MAKEUP AIR UNIT(MAU-1) W/ EXHAUST FAN (KEF-1) TO ENERGIZE SUPPLY FANS WHEN EXHAUST FANS ARE ACTIVATED.20. THE HVAC, REFRIGERATION, AND FIRE SUPPRESSION SYSTEM SHALL NOT CONTAIN CFC
<br /> i 1 0r UD-03 T �
<br /> OR HALONS, C. INTERLOCK MAKEUP AIR UNIT(MAU-2) WI EXHAUST FAN (KEF-2) TO ENERGIZE SUPPLY FANS WHEN EXHAUST FANS ARE ACTIVATED. i co
<br /> 1. ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENTS SHALL BE COVERED
<br /> I I
<br /> WITH TAPE, PLASTIC, OR SHEET METAL UNTIL FINAL STARTUP OF THE HEATING, COOLING ® - -_---� • I •
<br /> AND VENTILATING EQUIPMENT. I II I I 16� I � O
<br /> 22, IF H NEW HVAC SYSTEM IS USED DURING CONSTRUCTION, USE RETURN AIR FILTERS
<br /> FAN SCHEDULE I _�= I I �_ I z I ® o
<br /> `l -- -- --i - -
<br /> WITH A MERV OF 8. REPLACE ALL FILTERS IMMEDIATELY PRIOR TO OCCUPANCY. I � O
<br /> MARK SERVICE MANUFACTURER MOUNTING MODEL CFM ESP DRIVE MIN. FAN ELECTRICAL WEIGHT NOTES I - -� -W -- - __�
<br /> 23. AN OPERATION & SYSTEM MANUAL SHALL BE PROVIDED TO THE FIELD INSPECTOR AT (EA, RA, SA) i ;DD
<br /> THE TIME OF FINAL INSPECTIONS. (IN) (BELT/DIRECT) HP RPM VIPH FLA DISC. TYPE LBS i L__W- J O
<br /> ` .
<br /> KEF-1 EXHAUST CAPTIVE-AIRE ROOF DU85HFA 1800 1.00 DIRECT 0.8 1369 20813 2.6 FUSED 99 A-C E
<br /> 24, REFER TO MECHANICAL SPECIFICATIONS, SHEET M4, FOR HVAC SYSTEM CONTROLS, KEF-2 EXHAUST CAPTIVE-AIRE ROOF DU180HFA 3050 1.50 DIRECT I � ® ® 9 (�'P ® �
<br /> SPECIFICATIONS AND TEST & BALANCE REQUIREMENTS. FINAL SYSTEM TESTING, 1.5 1321 20813 6.6 FUSED 179 A,B,D ) ® j
<br /> BALANCING AND ADJUSTMENTS SHALL BE PERFORMED BY A CONTRACTOR CERTIFIED 12� 12�
<br /> BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) OR ASSOCIATED AIR EF-1 EXHAUST GREENHECK CEILING SP-6110 75 0.2 DIRECT 80W 1140 12011 _ E_G L____ 12�
<br /> BALANCE COUNCIL {AABC}, - 4 1 CD-3
<br /> EF-2 EXHAUST GREENHECK CEILING SP-6110 75 0.2 DIRECT 80W 1140 12011 - E-G Cb-3 504,-3 120 CD 4 DATE: 10.17.2018
<br /> 25, A FINAL REPORT FOR TESTING AND ADJUSTING OF ALL NEW SYSTEMS SHALL BE 500
<br /> COMPLETED AND PROVIDED TO THE FIELD INSPECTOR PRIOR TO FINAL APPROVAL. THIS NOTES: ® 500 REVISION
<br /> 0
<br /> REPORT SHALL BE SIGNED BY THE INDIVIDUAL RESPONSIBLE FOR PERFORMING THESE I 0
<br /> SERVICES. A. REFER TO CAPTIVE-AIRE DRAWINGS FOR SPECIFICATIONS, SCHEDULE SHOWN FOR REFERENCE ONLY
<br /> B. DIVISION 16 CONTRACTOR TO FURNISH DISCONNECT SWITCH.
<br /> C. INTERLOCK KEF-1 WITH KITCHEN COOKING EQUIPMENT UNDER HOOD#1, MAKE-UP AIR UNIT(MAU-1) AND ROOF TOP UNIT(RTU-1).
<br /> D. INTERLOCK KEF-2 WITH KITCHEN COOKING EQUIPMENT UNDER HOOD#2, MAKE-UP AIR UNIT(MAU-2) AND ROOF TOP UNIT(RTU-2).
<br /> E. MANUFACTURER TO PROVIDE 8" HIGH ROOF CURB AND MODEL GRS-08 SPUN ALUMINUM ROOF CAP
<br /> WITH INTEGRAL BIRDSCREEN AND BACKDRAFT DAMPER. Q
<br /> F. PROVIDE RUBBER IN SHEAR ISOLATION AND ALL-THREAD HANGING RODS.
<br /> G. INTERLOCK FAN OPERATION WITH RESTROOM LIGHT SWITCH.
<br /> P
<br /> EXISTING TO REMAIN ROOFTOP UNIT SCHEDULE (NATURAL GAS HEATS _�����A� �` cp�y�
<br /> m
<br /> MARK MANUFACTURER MODEL SUPPLY FAN COOLING COIL 36rn
<br /> 618
<br /> HEAT EXCHANGER MIN. MIN. MCA MOCP VIPH NOTES
<br /> FAN CFM MIN ESP REFR. TH SH EAT IAT MIN. OUTPUT MIN. EFF. NOM. INPUT MIN. NO. LAT O/A EER
<br /> TYPE HP IN TYPE MBH MBH DB WB DB I WB MBH % MBH STAGES DB F CFM MEC 9'
<br /> RTU-1 TRANE YHCO90 FC 3,000 2.00 0.5 R-410A 90.0 76.5 79.0 65.0 56.0 55.0 96 80 120 1 90 550 12.6 43 50 208/3 A-C &SCA
<br /> H ANI CAL FLOOR PLAN OFLE: 1 0"
<br /> TRANS YHC090 FC 3,000 2.00 0.5 R-41
<br /> 0A 90.0 76.5 79,0 65.0 56.d 55.0 96 80 120 1 90 550 12.6 43RTU- 50 20813 A-C
<br /> TES.
<br /> MECHANICAL
<br /> FLOOR PLAN
<br /> A. PROVIDE 7-DAY PROGRAMMABLE THERMOSTAT WITH STAGED HEATING AND COOLING CAPABILITY AS REQUIRED FOR OPERATION OF HEATING AND COOLING CONTROLS. &
<br /> B. PROVIDE 2", MERV-8 PLEATED THROWAWAY AIR FILTERS. SCHEDULES
<br /> C. EXISTING SMOKE DETECTORS IN SUPPLY AIR DUCTS.
<br />
|