My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3291
>
2900 - Site Mitigation Program
>
PR0527277
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:10 PM
Creation date
4/3/2020 2:02:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527277
PE
2950
FACILITY_ID
FA0018475
FACILITY_NAME
SAN JOAQUIN CO AUCTIONEERS
STREET_NUMBER
3291
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17909012
CURRENT_STATUS
01
SITE_LOCATION
3291 S HWY 99
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan—Soil Boring Installation Page 3 <br /> 3291 S.Hwy 99 <br /> Project 472.2 <br /> July 16, 2007 <br /> 2.0 PROPOSED INVESTIGATION <br /> Prior to commencing fieldwork, the required County drilling permit will be <br /> obtained. <br /> 2.1 Field Work <br /> The field work associated with this work plan will consist of mobilizing to the <br /> site with a Geo-Probe drilling rig and advancing three soil borings at designated <br /> locations for the purpose of obtaining soil.and groundwater samples. <br /> 2.1.1 Geo-Probe Soil Borings <br /> The Geo-Probe soil borings will be advanced to a depth of about 25 feet, which is <br /> above the groundwater surface, which is estimated to lie at about 70 feet. The <br /> borings, designated S13-1 and SB-2 will be located near either end of the <br /> rectangular leach field. <br /> Soil samples will be collected continuously from each boring. <br /> The Geo-Probe soil borings will be drilled using 2-inch outside diameter, dual <br /> tube, Geo-Probe drilling equipment owned and operated by RSI Drilling of <br /> Woodland, CA, a C-57 Licensed drilling contractor (C-57 No. 802334). Upon <br /> reaching total depth in each boring and collecting a final soil, the boring will be <br /> filled to grade with neat cement. <br /> The Geo-Probe is a truck mounted drilling system that uses direct push <br /> methodology to collect soil and groundwater samples. Four foot long by 1.5-inch <br /> diameter stainless steel rods are pushed or hammered into the ground using a <br /> hydraulic ram or the hydraulically,actuated hammer mounted on the ram. Soil <br /> samples are collected using a 4-foot long by 1.5 inch inside diameter drive <br /> sampler lined with a plastic sample sleeve. <br /> 2.1.2 Geology <br /> A detailed log will be made of each boring. The information to be noted include <br /> such data as sample depths, soil / sediment type and description (color, texture, <br /> composition, hardness, moisture content, and post-depositional changes that <br /> have occurred in the sediments), and horizons of detectable contamination <br /> (detected by field methods). <br /> 2.2 Soil Sampling and Analyses <br /> The soil sample collection procedure will be as follows. Upon retrieval, as <br /> described above, the soil samples will be described and logged. The ends of each <br /> plastic sample tube removed from the coring device and possibly submitted for <br /> 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209)569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.