Laserfiche WebLink
Robinhood Plaza Shopping C - 5756 Pacific Avenue, Stockton, CA� Page 1 of 5 <br /> Mike Infurna [EH] <br /> From: Freeman, Lita [Lita.Freeman@Ifr.com] <br /> Sent: Wednesday, September 03, 2008 10:42 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Robinhood Plaza Shopping Center- 5756 Pacific Avenue, Stockton, CA <br /> Mike <br /> We are planning three borings with soil and groundwater samples collected from each. I am having 2 checks <br /> overnighted to you today (one for$89 and one for$315 per your instructions). Overtime is authorized for <br /> processing of the permits since the client needs this data. <br /> Please let me know if you need anything else or have any questions <br /> Thanks <br /> Lita <br /> Lita D. Freeman, P.G., R.E.A. Il, C.A.C. <br /> Principal Geologist <br /> LFR Inc. <br /> 4190 Douglas Boulevard, Suite 200 <br /> Granite Bay, CA 95746 <br /> Phone: 916-786-2456 <br /> Fax: 9 16-786-0366 <br /> Cell: 510-918-5960 <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Wednesday, September 03, 2008 8:29 AM <br /> To: Freeman, Lita <br /> Subject: RE: Robinhood Plaza Shopping Center - 5756 Pacific Avenue, Stockton, CA <br /> thank you. <br /> gw grabs only mentioned abandonment of the hydropunches by SJCEHD policy. <br /> how many you proposing? 3 locations = 3 borings? <br /> neat cement to surface is the way. room at the surface can be left for material to <br /> match surrounding. (asphalt, black concrete, landscaping, etc). I'll need to be onsite <br /> for the first grout. <br /> submitting on Tuesday is really pushing it. like I said before, go for it. I can't promise <br /> I'll get to it. <br /> rushing goes both ways. rush to start means RUSH to get the report out and pay <br /> bills sent by EHD on time. It's a two way street. Three months for report to get to <br /> me from last phase is NOT rushing (last day of drill 4-9-08 and report here July 14). <br /> Billing last time went to SECOND notice, as in past due. <br /> based on rush and overdue payment history, I'll require a 3-hour prepayment also to <br /> credit this account. At $105/hour, remit $315 in a separate check in addition to the <br /> $89 check for the permit. If I can't get to it during normal business hours to meet <br /> 9/9/2008 <br />