My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:42:53 PM
Creation date
4/3/2020 2:32:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
have much to do on other sites and waiting to review your proposal still for work in <br /> less than two days puts an imposition on me. <br /> Take the time to submit your request to modify immediately. <br /> Additionally, Arcadis consulting is still listed as the billing party for this CVRWQCB <br /> lead site. With Arcadis no longer working on this site, a new billing party is to be <br /> established BEFORE I can continue to do chargable work for this site, unless Arcadis <br /> is to STILL receive billing from the EHD?. Attached is a Master File Record (MFR) <br /> form. Print it and fill in Property Owner and Facility information and sign it. <br /> It MUST be completed and signed and returned to the EHD BEFORE I can conduct <br /> the inspection on Wed, Aug 12. Chevron can be the billing party or HFA or another <br /> entity. Please complete the bottom portion of the MFR, "Third Party" billing if <br /> CHEVRON is not the billing party. <br /> The completed MFR and the work plan modification request MUST be on my desk <br /> NLT noon, Tuesday, Aug 11 . <br /> I need time to process and approve the forms and time to modify it again if needed... <br /> Eli, please call me to confirm receipt of this email. <br /> -----Original Message----- <br /> From: Mike Infurna [EH] <br /> Sent: Wednesday, August 05, 2009 3:14 PM <br /> To: 'Eli Scott' <br /> Subject: RE: Chevron Site 96171 (6633 Pacific Avenue) Follow-up <br /> Although I initially approve pressure grouting these two wells, you have not provided <br /> me information on hole preparation (if any) and the additional requirements for <br /> pressure grout the EHD requires. <br /> Please submit a revision to the work plan that includes the procedures, materials, and <br /> hole/well head preparation, and hole/well head completion specifications. <br /> I will review your submittal and advise. If approved, I will modify the permit, making the <br /> one I sent you today invalid. <br /> Do you plan on air knifing at all around these well heads? Has Chevron waived this <br /> requirement? If Chevron is waiving the air knife clearing hole, then why not just drill <br /> down the casing with a 8/10" hollow stem auger? <br /> Do you just plan on just filling the casing and leaving the traffic box in the ground? <br /> How do you plan on providing the grout cap over the PVC casing after it is pressure <br /> grouted? <br /> Address these and any other concern you're contemplating in the revision. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.