My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:42:53 PM
Creation date
4/3/2020 2:32:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. James L.L. Barton, <br /> ARCADIS P.G. <br /> May 29, 2009 <br /> conjunction with the USA, a private utility locating company will be utilized to further <br /> evaluate boring locations relative to underground utilities. <br /> Well Destruction Activities <br /> Pressure Grout and Over Drill <br /> Prior to drilling, a minimum of three points,arranged in a triangle, will be cleared <br /> around each well using either a hand auger or air knife to.a maximum depth of 5 feet +l / <br /> 1 inch bgs to visually inspect for the presence of utilities. Monitoring wells MW-2, V <br /> MW-3, MW-4, MW-5, MW-6, MW-7, MW-8, MW-9, MW-10, MW-11 D, MW-12, MW- <br /> 13, and MW-14 will then be destroyed by removing the well box and pressure <br /> grouting each well in-place from the bottom of the borehole to surface grade using a <br /> tremie pipe and cement-bentonite grout. Per SJCEHD guidelines each well will be <br /> grouted to form a"mushroom cap"at the surface of the borehole.The top three feet <br /> will then be over-drilled with 12 inch outer diameter(OD)hollow stem auger(HSA). <br /> The upper 5 feet will be backfilled with granulated bentonite chips and completed at <br /> grade with material matching the existing surface(e.g. asphalt,concrete, etc.). <br /> Soil Cuttings and Rinsate Water <br /> Soil cuttings generated during drilling operations will be containerized in 55 gallon <br /> drums or stockpiled and temporarily stored on the subject property pending <br /> characterization and disposal. Soil cuttings will be removed by Chevron's disposal <br /> contractor to an appropriate disposal facility.Water generated during steam cleaning, <br /> i <br /> and sampling of the borings-will be temporarily_stored in DOT-approved 55 gallon <br /> drums pending transport by Chevron's disposal contractor to an appropriate disposal <br /> or treatment facility. <br /> Reporting <br /> A report will be prepared to document the results of the destruction of onsite.and <br /> offsite monitoring and extraction.wells and the decommissioning of the remedial <br /> system.The report will include ata minimum the following: <br /> • a summary of site conditions and background information j <br /> I <br /> • a scaled site plan illustrating the destroyed well locations andotherrelevant- - <br /> site features <br /> Page: <br /> llxcadis-uslofficedalalSacramento-CA1ENVICHEVRONt9617116 OeliverahlesMork Plant200919617.1 Well Destruction Work Plan 333910950.doc 4/5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.