My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:37:06 PM
Creation date
4/3/2020 2:34:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCADIS , ARCADIS <br /> Infrastructure, environment,.buildings 950 Glenn Drive <br /> Suite 125 <br /> Folsom <br /> California 95630 <br /> Mr. Michael J. Infuma <br /> Tel 916.985.2079 <br /> Senior Registered Environmental Health Specialist Fax 916.985.2093 <br /> -San Joaquin County Environmental Health Department www.arcadis-us.com <br /> 600 East Main Street <br /> Stockton, California 95202 <br /> ENVIRONMENT <br /> Subject: <br /> Revised ork Plan for Well Destruction <br /> Chevro Service Station 96171 <br /> Pacific Avenue <br /> Stockton, California Date: <br /> June 18,2009 <br /> Dear Mr. lnfuma: Contact: <br /> Tonya R. Myers <br /> On behalf of Chevron Environmental Management Company(Chevron),ARCADIS <br /> has prepared this letter to provide a revised approach for the destruction of Phone: <br /> monitoring wells associated with Chevron service station 96171 located at 6633 916.985.2079 ext.15 <br /> Pacific Avenue in Stockton, California.The monitoring well destruction method Email: <br /> proposed in ARCADIS' Work Plan for Well Destruction dated May 29, 2009 consisted tonya.myers@arcadis- <br /> of pressure grouting to total depth and over-drilling the upper 3 feet of each well. us:com <br /> However, this approach was rejected by the San Joaquin County Environmental burref: <br /> Health Department(SJCEHD)as indicated in their e-mail dated June 15,2009,due 60046600.0000 <br /> to the dissolved perchloroethylene(PCE)plume associate with historical dry cleaning <br /> operations at the adjacent shopping center which extends beneath the Chevron site. <br /> Therefore, as requested by the SJCEHD, the monitoring well network will be over- <br /> drilled to total depth of construction.The specific methodology is discussed below. <br /> Proposed Scope of Work <br /> The scope of work includes the destruction of the 13 monitoring wells associated with <br /> the Chevron site(Figure 1).A schedule of the proposed monitoring well destruction <br /> activities are presented in Attachment 1. Well construction logs for the existing <br /> monitoring well network are provided in Attachment 2,with the exception of MW-7. <br /> No information is available on the installation of monitoring well MW-7:MW-7 is a 2- <br /> inch diameter monitoring well, and the measured total depth of the well is 62.69 feet <br /> below grade. <br /> I <br /> Imagine the result <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.