My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REID
>
0
>
2900 - Site Mitigation Program
>
PR0527419
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:13:06 PM
Creation date
4/7/2020 1:09:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527419
PE
2950
FACILITY_ID
FA0018566
FACILITY_NAME
YARA NO AMERICA / POS
STREET_NUMBER
0
STREET_NAME
REID
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
16203001
CURRENT_STATUS
01
SITE_LOCATION
REID AVE
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WGR <br /> i • <br /> Southwest, Inc. <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION....................................................................................................................1 <br /> 2.0 SITE SETTING........................................................................................................................1 <br /> 3.0 GEOLOGY/HYDROGEOLOGY.........................................................................................2 <br /> 4.0 SITE HISTORY.......................................................................................................................3 <br /> 5.0 PROPOSED FIELD ACTIVITIES........................................................................................3 <br /> 5.1 HEALTH AND SAFETY PLAN.....................................................................................................4 <br /> 5.2 PERMITTING.............................................................................................................................4 <br /> 5.3 DRILL SITE CLEARANCE...........................................................................................................4 <br /> 5.4 SOIL BORINGS..........................................................................................................................4 <br /> 5.5 SOIL SAMPLING AND ANALYSIS...............................................................................................5 <br /> 5.7 DISPOSAL OF WASTE MATERIALS............................................................................................6 <br /> 6.0 REPORTING AND SCHEDULING......................................................................................6 <br /> FIGURES <br /> FIGURE 1: Site Vicinity Map <br /> FIGURE 2: Site Plan with Proposed Boring Locations <br /> 773. PRI.02 i September 4, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.