Work Planer Additional Site Assessment
<br /> Jimco Truck Plaza
<br /> C A M B R I A 1022 Frontage Road
<br /> Ripon,California
<br /> May 18,2005
<br /> 8.0 REFERENCES
<br /> Advanced Geo Environmental,Inc., 1999: Revised Preliminary Investigation and Evaluation Report,
<br /> Jimco Truck Plaza, 22502 South Highway 99,Ripon, California,December 13, 1999
<br /> Advanced Geo Environmental,Inc.,2002: Well Installation and GroundwaterAquifer Pumping Test
<br /> Report,Jimco Truck Plaza,22502 South Highway 99,Ripon,California,November 6,2002.
<br /> Advanced Geo Environmental,Inc., 2003: Well Survey and Site Model,Former Olympian -Jimco
<br /> Truck Plaza, 22502 South Highway 99,Ripon, California,June 6, 2003.
<br /> Advanced Geo Environmental,Inc., 2004: Quarterly Report—Fourth Quarter 2004,Jimco Truck
<br /> Plaza,22502 South Highway 99,.Ripon, California,December 27, 2004.
<br /> Cambria Environmental Technology Inc.2005:First Quarter 2005 Monitoring Report,Jimco Truck
<br /> Plaza, 1022 Frontage Road,Ripon, California,March 31, 2005.
<br /> Grayland Environmental 1998: Underground Storage Tank Removal Report, Jimco Truck Plaza,
<br /> 1022 Frontage Road,Ripon, California, September 22, 1998.
<br /> H:\Olympian\22502 South Hwy 99,Ripon\Reports\Work Plans\WP for Additional SA 5-16-05.doe
<br /> 10
<br />
|