My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:44:24 PM
Creation date
4/7/2020 1:29:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan f r Additional Site Assessment <br /> 1022 Frontage Road,Ripon, California <br /> C A M B R I A July 25, 2006 <br /> a <br /> 2.3 Local Geology and Hydrogeology <br /> �x Soils encountered during drilling consist primarily of interbedded sand,silty sand,sandy silt,silt,and <br /> I+ -r�cl2y Ore <br /> clay to a total explored depth of 60 ft bgs(boring B-18). Saturated silty sande encountered across the <br /> lives site at depths between 25 and 35 feet bgs. The shallow groundwater aquifer is detected within this <br /> silty sand bed. Boring and well construction logs detailing the subsurface findings are included in <br /> Appendix B. `/I1 1 YyrMO�o�rblr <br />'i P <br /> Since May 1998, groundwater monitoring activities have been ongoing at the site. Since 1998, the <br /> groundwater table has decreased in elevation from approximately 15 ft bgs to as deep as <br /> approximately 27 ft bgs. The decrease in the groundwater table elevation is presumed o be related to <br /> groundwater pumping at nearby municipal and domestic wells. On May 15, 20g5;groundwater 8 j <br /> flowed away the source area toward the northwest at a gradient of 0.0003 ft/ft (Figure 2). A rose <br /> diagram on Figure 2 represents the historical groundwater flow directions. Since 1998, the <br /> groundwater flow direction has varied.significantly with groundwater flow predominately toward <br /> the northwest. The varied groundwater flow direction is likely due to the flat groundwater <br /> gradient observed at the site and nearby groundwater pumping. <br /> 2.4 Sensitive Receptors <br /> In 2003,Advanced GeoEnvironmental,Inc.(AGE)of Stockton,California conducted a well survey to <br /> identify any domestic,municipal,irrigation,or monitoring wells within a 2,000-foot radius of the site. <br /> The well survey identified one municipal well and several domestic wells within the search radius. <br /> The municipal well is located 750 west of the site and is screened from 170 to 195 ft bgs, with <br /> additional screened intervals below this depth. Well DW-1 is located onsite near well MW-8 and is <br /> screened from 160 to 200 ft bgs./Well DW-1 is used to operate the truck wash onsite. A domestic or <br /> commercial well is located 175 ft southeast of the site on Ripon Farm Service property and is screened <br /> from 176 to 196 ft bgs. A third domestic well is located at 23066 South Highway 99 and is screened <br /> from 180 to 200 ft bgs. Detailed findings of the well survey are presented in AGE's Well Survey and <br /> Site Model dated June 6, 2003. The closest water body to the site is the Stanislaus River which is <br /> located approximately 9,000 ft south of the site. ' <br /> 3.0 PREVIOUS INVESTIGATIONS <br /> Below is the chronology of site assessment, feasibility testing and interim remedial activities at the <br /> site. Historical soil and groundwater analytical data are presented in Tables 1 and 2, respectively. ' <br /> October 1996: In October 1996,AGE drilled borings*B 14 through*B 16 along the southern border <br /> of the site. These borings were part of AGE's delineation of a hydrocarbon plume originating from <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.