Laserfiche WebLink
Projecl: Ripon Fane SJ3 e Project No.: AGJS�C-95-0137 BORING NO,- <br /> Site Address: 22871 South Highway 99 Total Depth: 30 Feet B22 <br /> Ripon, California Date: 13 May 1998 MW-8 <br /> Drilling Co.: Mitchell Drilling Environmental Logged by: Little Page l of I <br /> Rig/Auger Type: CME 75 / 10' Reviewed by: Henderson <br /> ::...:.. ......:.:::...:.. : <br /> B22-5 0 11/13/17 CL Tan,moist,silty CLAY; no hydrocarbon (HC)odor. <br /> 1 B22-10 0 12/18/26 CL same as described above <br /> r//B22-15 0 12/27/40 CL same as described above <br /> ?_ B22-20 0 12/13/17 SM Gray,moist to wet,silty SAND,no HC odor. <br /> 25 B22-25 0 12/18/16 SM : . same as described above, slight HC odor. <br /> SM <br /> 3 B22-30 0 12/16/17 same as described above <br /> Boring terminated at 30 feet- <br /> Ground water encountered at 19 feet <br /> Boring completed as ground water well MDV-8. <br /> Advanced <br /> GeoEnvironmental, Inc. <br /> 1'W M IPR(1\Rl1R INf:-11RGCNNK3 Cahi <br />