Laserfiche WebLink
.+ <br /> CONCRETE APF.ON -� <br /> LOCKING WELL COVER <br /> LOCKING CAP -J <br /> 1 <br /> NEAT CEMENT <br /> BLANK 40 PVC CASING (SCHEDULE 40) <br /> 0 - 15 FEET <br /> BENTONITE PLUG 2 FEET <br /> FILTER PACK (,y2 SAND) <br /> 0.020 SLOTTED PVC SCREEN (SCHEDULE 40). <br /> 15 - 30 FEET <br /> TOTAL DEPTH 30 FEET <br /> CAP <br /> B" BOREHOLE DIAMETER <br /> MONITORING WELL DESIGN <br /> ALL DEPTHS RELATIVE TO SURFACE GRADE <br /> NOT TO SCALE <br /> WELL DESIGN MW-6, MW "7, MW-8 ® advanced <br /> RIPON FARM- SERVICE GeoEnvironmental, Inc. <br /> /yOlUlGlp C Ili lD%i <br /> 22871. SOUTH HIGHWAY 99 PROJECT NO- 95-0137 FILE: 95-0137 ' FIGURE: <br /> RIPON, CALIFORNIA DATE: 20 JULY 1988 DRAWN BY: KMM I C <br />