Laserfiche WebLink
SHARPE SITE EXTRACTION AND INJECTION WELL <br /> WORK PLAN <br /> MARCH 1993 <br /> Section 9.0 provides the rationale and proposed locations for the 12 extraction wells (Optimal Design Scenario) <br /> in the Central Area Extraction System, two extraction wells to supplement the North Balloon Area Extraction <br /> System, and nine injection wells to be installed in the Injection Well System. Three of the injection wells(IW-A, <br /> B/C) have already been permitted and installed previously. Well construction details are shown for the <br /> extraction and injection wells in Figures 4 and 5, repectively. Figure 9-1 shows the locations for the proposed <br /> wells. <br /> L <br />