Laserfiche WebLink
5.0 SCHEDULE AND SUBMITTALS <br /> The AE shall submit all data to the Contracting officer and other reviewers <br /> shown in Section 4. 12 in accordance with the following schedule. All submit- <br /> tals shall be delivered to all addressees no later than the close of business <br /> on the day indicated in this paragraph. In addition, submittals to regulatory <br /> reviewers shall be shipped by registered mail or other method where a signed <br /> receipt indicating delivery is obtained. <br /> Document Date Due <br /> (Calender Days After Award) <br /> 1. (Draft) Remedial Design Work Plan (RDWP) 30 <br /> 2. (Draft Final) RDWP 60 <br /> 3. (Final) RDWP 90 <br /> 4. Topographic Survey & Mapping 90 <br /> S. (309) Remedial Design 150 <br /> 6. 309 Design Review Meeting @ Sharpe 180 <br /> 7. Field Investigation Report 210 <br /> 8. (609) Remedial Design 210 <br /> 9. (609) Cost Estimate 225 <br /> 10 609 Review Meeting @ AE's Office 240 <br /> 11. (959) Remedial Design 270 <br /> 12. (959) Cost Estimate 285 <br /> 13. 959 Review Meeting @ Sharpe 300 <br /> 14. (1009) Remedial Design 330 <br /> 15. (1009) Cost Estimate 345 <br /> AA-13 <br />