My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDJC-Sharpe Work Plan-Demolitio*Building 137,Closure of Well 2 <br /> • 1.0 INTRODUCTION 2.0 TASK SUMMARY <br /> 1.1 The purpose of this task-specific work plan 2.1 This well-closure plan was submitted o the <br /> is to describe activities relating to the closure Regional Water Quality Control Board <br /> (abandonment)of Well 2 and the demolition of (RWQCB) and the San Joaquin County <br /> Building 137 at Defense Distribution Depot San Environmental Health Department(SJCEHD) in <br /> Joaquin(DDJC),Sharpe Site located near the September 1999 for approval.A downhole video <br /> north balloon(see attachment 1). As proposed, survey of Well 2 was performed on 15 October <br /> URS Corporation(URS) will provide all 1999, and copies of the video were submit ed to <br /> necessary equipment, manpower,and materials the RWQCB and SJCEHD on 20 October 999. <br /> to perform the work as scoped, including The downhole video showed: the well total <br /> addressing all health and safety concerns related depth is 290 feet below ground surface(bgs) <br /> to the performance of field work. All work will (assumed sediment from 290 feet to 333 feet <br /> be performed in accordance with the DDJC- bgs); well screen intervals are 122-126 fee bgs, <br /> Sharpe/Tracy Comprehensive Field Work Plan 176-182 feet bgs, and 192-206 feet bgs; and <br /> and Waste Management Plan, and with all casing diameter and depth is 18-inch casin <br /> applicable Federal,State, and local regulations from ground surface to 30 feet bgs and 14 inch <br /> and requirements. This work effort is being casing from 30 to 290 feet bgs. Review <br /> conducted under contract with the U.S. Army comments on the final work plan and downhole <br /> Corps of Engineers,Huntsville Center video were received from RWQCB and <br /> (CEHNC),Task Order(TO) 38. SJCEHD, and a response memorandum was <br /> submitted on 10 October 2001 (review <br /> 1.2 Work proposed in this work plan will comments were also addressed in this revi ed <br /> include the demolition of Building 137, which final document).Final approval of proposed <br /> houses the Well 2 surface completion and work by RWQCB and SJCEHD is pending. <br /> • appurtenances, and the pressure grouting and <br /> closure of Well 2(to be completed under 2.2 After acceptance of this revised well <br /> subcontract to a drilling contractor yet to be closure plan by the RWQCB/SJCEHD, U S <br /> determined). Demolition will include the will re-mobilize to the site for completion of the <br /> removal of asbestos shingles attached to the scope of work. Demolition will not occur i ntil <br /> building sides and disposal at an approved the following has been completed; <br /> facility. Work on the demolition of Building 137 <br /> will begin in conjunction with the closure of • An Asbestos Notification has been <br /> Well 2, while completion of grouting and submitted to and approved by the San <br /> closure of Well 2 will be scheduled after the Joaquin Unified Air Pollution Control <br /> building has been removed. District; <br /> 1.3 All work will be conducted in coordination • A Demolition Permit Release has been <br /> with Mr.John Guzman of DDJC-FA. issued by the San Joaquin Unified Air <br /> Pollution Control District;and <br /> 1.4 The purpose of the proposed work is to <br /> close Well 2 for future use, as it no longer serves * Payment of a nonrefundable fee upon I Cling <br /> as a domestic water supply well. Building 137 the asbestos notification subject to the <br /> will be removed, including all asbestos shingles provisions of Rule 4002(National <br /> attached to the building. This plan provides a Emissions Standards for Hazardous A' <br /> general description of the scope of the proposed Pollutants). <br /> work and can be incorporated as such. <br /> 2.3 Confirmation of underground utilities and <br /> • locations of service lines will be made by I JSA <br /> Services and Subtronics Co.This informati on <br /> WELL2-WP.DOC 1 9 November 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.