My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDJC-Sharpe Work Plan-Demolitiol*Building 137,Closure of Well 2 <br /> will be used in conjunction with any as-built • ACM removal will include the use of water <br /> • drawings provided by DDJC and Mr.John misters or hose sprayer to control dust The <br /> Guzman. material will remain wet throughout the <br /> removal process. <br /> 2.4 Asbestos shingles will be removed and <br /> disposed of prior to demolition of the building's • ACM containerization for shipment to a <br /> wood-frame structure. All Asbestos Containing certified landfill will include placing the <br /> Materials (ACM) will be removed and handled material in clear plastic bags and placed in <br /> according to the following regulations that an enclosed container. <br /> pertain to ACM, in addition to all other <br /> applicable Local, State, and Federal regulations; • ACM disposal will occur once the <br /> appropriate preliminary analysis,wast <br /> • Title 8, California Code or Regulations, profile, and manifesting has been completed <br /> Article 2.6, Section 3415.15. Certified and approved by the disposal facility. The <br /> Asbestos Consultant/Site Surveillance waste manifest will be signed by John <br /> Technician,California OSHA. Guzman of DDJC-FA Sharpe.The material <br /> may then be scheduled for transport ar d <br /> • Title 8, California Code or Regulations disposal as Non-Friable asbestos hazaidous <br /> Section 1529—Occupational Exposure to waste at one of the following approve <br /> Asbestos. asbestos disposal facilities: <br /> • Title 40 Code of Federal Regulations Part 61 Azuza Land Reclamation <br /> Subparts A and M (Revised Subpart B)— 1201 West Gladstone <br /> National Emission Standard for Asbestos Azuza,CA 91702 <br /> • • Title 40 Code of Federal Regulations Part or: <br /> 763 "Asbestos-Containing Materials in <br /> Schools"; Final Rule and Notice (for LaPaz <br /> institutions under the guidelines of the" 26999 Highway 95 <br /> Asbestos Hazard Emergency Response Act" Parker,AZ 95344 <br /> (AHERA])" <br /> Final destination of the asbestos will d pend <br /> 2.5 The removal and disposal of ACM will on the total estimated volume,followh ig <br /> include the following controls and procedures; removal. <br /> • Dust Control will be achieved using • Site cleanup will occur after all ACM has <br /> containment and water misters. been removed as appropriate. <br /> • Containment chamber will be constructed 2.6 Using an excavator fitted with a"thu b" <br /> as an engineering control to contain friable attachment,the field crew will remove the <br /> dust generated during ACM removal roofline of the building to create room for <br /> activities.The containment will be removal of the well head.The field crew A ill <br /> constructed with PVC framing and 6-mill create separate stockpiles for debris,classil led <br /> plastic.The containment structure will by material type.As roofing materials are <br /> include a two stage decontamination station removed, the URS field crew will load <br /> at the entry point. construction debris into a transport vehicle <br /> provided by a trucking subcontractor. <br /> • Water misters will be used to keep the <br /> ACM wet during removal to control 2.7 Using a boom truck, the field crew wi 1 <br /> • airborne dust. hoist the existing well head and seal the wt 11 <br /> opening with a blind flange to avoid entry of any <br /> WELL2-WRDOC 2 9November 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.