• DDJC-Sharpe Work Plan-Demolitis Building 137,Closure of Well 2 <br /> • "mushroom-shaped"area about 2 feet <br /> surrounding the well. <br /> • Representatives of the SJCEHD will be <br /> notified at least 48 hours in advance of <br /> the start of well abandonment to allow <br /> time for a field inspection. <br /> • Following well abandonment, a Well <br /> Completion Report (Form DWR 188) <br /> describing the well destruction will be <br /> submitted to the State of California <br /> Department of Water Resources.The <br /> report will be signed by a representative <br /> of the drilling contractor performing the <br /> abandonment. <br /> 2.10 A video log of construction activities, <br /> including well closure, will be available upon <br /> project completion. URS will also provide a <br /> supplementary written log corresponding with <br /> the video log. In addition, photographs of the <br /> field activities will be taken.Daily Field Reports <br /> will also be completed for distribution to <br /> CEHNC and DDJC during the field activities. <br /> • 2.11 All work activities performed as part of <br /> the well-abandonment and pumphouse <br /> demolition effort will be documented in the <br /> comprehensive TO 38 Engineering Technical <br /> Memorandum. <br /> • <br /> WELL2-WP.DOC 4 9Novem er 2001 <br />