My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDJC-Sharpe Work Plan-Demolitiote Building 137,Closure of Well 2 <br /> foreign materials into the well. After removal of screen interval to facilitate grout a Ary <br /> • the well head,the URS field crew will begin a through screen perforations and in o the <br /> systematic dismantlement of the existing wood- filter pack and formation. <br /> frame structure.This will include all constructed <br /> attachments,and will be completed by • The volume of required plugging <br /> demolition of the concrete foundation that is part material will be calculated prior to grout <br /> of Building 137,including the removal and mixing,taking into consideration dasing <br /> disposal of the concrete material. diameter, well depth,and applicable loss <br /> of material to the formation. Well <br /> 2.8 Using a slurry mix, URS and the drilling construction details are included i <br /> field crews will pressure grout Well 2 through attachment 2. Based on well casing <br /> screened intervals; any excess water that is diameter,the volume of grout reqt ired <br /> produced during grouting will be containerized. to fill the casing is estimated to be 2,475 <br /> It is assumed that the displaced water in the well gallons.Verification during grout <br /> will be used in conjunction with the slurry mix placement will ensure that the voli ime of <br /> design.Any well water displaced by grouting sealant equals or exceeds the volui ne of <br /> that has a pH measurement of 7.8 or greater will the casing. <br /> be contained in drums. All drummed water will <br /> be disposed at an on-depot groundwater • During grout placement, necess <br /> treatment plant. injection pressure will be calculaf d to <br /> achieve an effective seal,using specific <br /> 2.9 Grouting procedures will include the gravity of the grout mixture and <br /> following: hydrostatic head of the grout column. <br /> The amount of pressure applied depends <br /> • Well-abandonment procedures will on the characteristics of the cement <br /> • adhere to requirements set forth in slurry, slot size of the well screen, <br /> Bulletin 74-90, California Well characteristics of the filter pack at d <br /> Standards(Department of Water formation,temperature, and well epth <br /> Resources). (estimated pressure using a grout 1 veight <br /> of 16 pounds per gallon grout slur is <br /> • The slurry mix(i.e.,grout) will consist 0.83 pound per square inch per foot <br /> of a mixture of Type 11 Portland cement, below grade, plus the pressure apt lied at <br /> or equivalent(e.g.,Micro Matrix the surface to be determined by the <br /> Cement®or Pozmiz), with 3 pounds of drilling subcontractor).Pressure st all be <br /> powdered nonbeneficiated bentonite and maintained for a length of time <br /> 7 gallons of water per 94-pound sack of sufficient for the cementing mixtul a to <br /> cement; grout materials will be weighed set.The pumping of grout is antici aced <br /> with a mud scale and metered for the to occur in three stages, with each 3tage <br /> appropriate water-to-cement ratio(slurry to approximately 10 feet above each <br /> weight of approximately 16 pounds per screen interval, with pressure <br /> gallon). An accelerant will be used if maintained approximately 15-30 <br /> needed, based on site conditions. minutes at each stage. <br /> • The consistency of the grout will be • After the well casing has been bac dilled <br /> sufficient to flow through the well with grout,the protective casing iN ill be <br /> screen and into the filter pack.The grout removed and the well casing cut off at <br /> will be pumped using a tremie pipe, least 2 feet below grade and removed. <br /> which will initially be set at the bottom Additional grout will continue to be <br /> of the well and will be lifted upward as added to the casing if any settlement <br /> • grout placement occurs; the bottom of occurs. After the casing is cut off 2 feet <br /> the tremie will be adjacent to each below grade, grout will be placed in a <br /> WELL2-WP.DOC 3 9Novem er 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.