My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to removal actions conducted pursuant to Section 104 of CERCLA, 42 U.S.C. <br /> 9604. <br /> 7.3 EPA, DOHS, and RWQCB reserve any authority they may have concerning <br /> removal actions conducted on the Site. <br /> 8. REMEDIAL INVESTIGATION <br /> 8.0 SHAD agrees it shall conduct an RI of the Site, including an RI for <br /> each Operable Unit, which is consistent with CERCLA/SARA and the NCP and <br /> which is in accordance with the time schedules set forth in Attachment 2 and <br /> the requirements set forth in Attachment 3. Any RI shall meet the purposes <br /> set forth in Section 5. The Parties agree that final Site clean-up level <br /> criteria will only be determined following the completion of the Baseline <br /> Risk Assessment. <br /> 9. FEASIBILITY STUDY <br /> 9.0 SHAD agrees it shall conduct an FS for the Site, including an FS for any <br /> Operable Unit, which is consistent with CERCLA/SARA and the NCP and which is <br /> in accordance with the time schedules set forth in Attachment 2 and the <br /> requirements set forth in Attachment 3. Any FS shall meet the purposes set <br /> forth in Section 5. <br /> 10. REMEDIAL ACTION SELECTION AND IMPLEMENTATION <br /> 10.0 Following completion and a review in accordance with Section 12, <br /> Consultation, of an RI report and the corresponding FS report for all or <br /> part of the Site, SHAD shall , after review in accordance with Section 12, <br /> -15- <br />
The URL can be used to link to this page
Your browser does not support the video tag.