Laserfiche WebLink
® . . <br /> Corporation RECEIVED <br /> OCT 2 5 1989 <br /> October 19, 1989 ENVIRONMENTALNEALTti <br /> PERMIT/SERVICES <br /> Ms. Linda Hogg <br /> Associate Hazardous Materials Specialist <br /> Department of Health Services <br /> Toxic Substances Control Division <br /> 10151 Croydon Way <br /> Sacramento, CA 95827-2106 <br /> Mr. Robert Niitlack <br /> Engineering Geologist <br /> Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road <br /> Sacramento, CA 95827-3098 <br /> Dear Linda and Bob: <br /> I appreciated meeting both of you in Sacramento on Tuesday, October <br /> 17, 1989. Under the circumstances, it was comforting to receive your <br /> practical suggestions and useful clarification of the State of <br /> California's position on the Overhead/Lodi Door surface impoundment <br /> project. Through the efforts of your departments and James Harvey over <br /> the past several years, much progress has been made. Now because of these <br /> efforts and in James' absence, I am hopeful the project can be carried to <br /> completion without incident. <br /> I agreed to provide you with the following schedule of upcoming <br /> events. The items to be scheduled are the disposal of the 700 cubic yards <br /> of staged waste, analysis of the extent of elevated nickel and zinc in <br /> three side walls, submission of the winterizing plan and revision of the <br /> closure plan. The schedule is as follows: <br /> 1. With the assistance of John Schweizer, P.E. and Brian Pletcher <br /> of RS Remediation Services, Inc. , we believe we can complete the <br /> removal of the 700 cubic yards of staged soil by November 24, <br /> 1989. To accomplish this we must locate and agree to terms with <br /> a landfill within the next three weeks and the hauler must be <br /> available to start on November 6. Any information you can <br /> provide to John and Brian that will help them make contact with <br /> qualified landfills during the next two weeks will be <br /> appreciated. <br /> 2. Three side wall tests will be done on the North (Grid L) , West <br /> (Grid K) and South (Grid J) walls of the surface impoundment. <br /> Sampling will be taken from the walls in accordance with the <br /> sampling plan as explained in Sampling Report prepared by Dallas <br /> Corporation and BSK Remediation in December, 1988. The lab will <br /> 6750 LBJ Freeway—75240 <br /> P.O. Box 809046 <br /> Dallas, Texas 75380-9046 <br /> 214/233-6611 <br />