Laserfiche WebLink
i <br /> SPCC PLAN REVIEW AND AMENDMENT CERTIFICATION <br /> As operator, CHCF-Stockton will amend this SPCC Plan in accordance with 40 CFR <br /> 112.7 whenever there is a change in facility design, construction, operation or <br /> maintenance which materially affects the facility's potential for the discharge of oil into <br /> or upon the navigable waters of the United States or adjoining shore lines. This record <br /> must be maintained and kept on file for at least 3 years. <br /> Plan Review—No Amendment Necessary <br /> I certify that I have made a complete review and evaluation of this SPCC Plan and have <br /> found no amendment to this Plan necessary. <br /> Owner or Operator: <br /> Signature: <br /> Date: <br /> Plan Review—Amendment Necessary <br /> I hereby certify that I have examined the facility and,being familiar with the provisions <br /> of 40 CFR, Part 112, attest that this SPCC Plan (including amendments) has been <br /> prepared in accordance with good engineering practices. <br /> Reason for amendment: SPCC Plan was updated to reflect the addition of a spill <br /> containment curb and secondary containment piping at the Generator Yard Facility. <br /> Seal <br /> Signature of Registered Professional <br /> Engineer <br /> Matt Weber <br /> Printed Name <br /> Date: Registration No: 51921 State: CA <br /> 8411599 <br />