My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:55 PM
Creation date
4/8/2020 2:23:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> Page <br /> _ Abbreviations and Acronyms ill <br /> 1.0 Introduction.........................................................................................................................................1 <br /> 2.0 Field Activities.....................................................................................................................................1 <br /> 2.1 Monitoring Well Sampling....................................................................................................1 <br /> 2.2 Laboratory Analysis...............................................................................................................1 <br /> 2.3 Equipment Decontamination Procedures...........................................................................1 <br /> L2.4 Investigation-Derived Waste Management........................................................................2 <br /> 3.0 Groundwater Monitoring Results.....................................................................................................2 <br /> 3.1 Hydrology...............................................................................................................................2 <br /> L 3.2 Groundwater Analytical Results..........................................................................................2 <br /> 3.3 Field Measured Parameters..................................................................................................3 <br /> -L 4.0 Discussion and Request for Site Closure.........................................................................................4 4.1 Site History..............................................................................................................................4 <br /> 4.2 Sensitive Receptor Survey.....................................................................................................6 <br /> 4.3 Site Geology............................................................................................................................6 <br /> 4.4 Site Hydrogeology.................................................................................................................7 <br /> 4.5 Extent of Petroleum Hydrocarbon Impacted Soil.............................................................8 <br /> 4.6 Extent of Petroleum Hydrocarbons in Groundwater.......................................................8 <br /> 4.7 Natural Attenuation.............................................................................................................10 <br /> 5.0 Concentration Trend Analyses........................................................................................................11 <br /> 6.0 Estimated Time to Reach Water Quality Objectives....................................................................14 <br /> 7.0 Discussion and Summary of Closure Rationale...........................................................................15 <br /> 8.0 References Cited................................................................................................................................16 <br /> Appendices <br /> A. Field Notes <br /> j B. Historic Monitoring Data <br /> L C. Laboratory Analytical Report <br /> D. Geologic Cross Sections <br /> L <br /> \\Eureka\projects\2007\009152-WOS\PUBS\rpt\20100324-1sffla1f2010GWMR&RFC.doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.