My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:55 PM
Creation date
4/8/2020 2:23:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
List of Illustrations <br /> Figures Follows Page <br /> 1. Site Location Ma <br /> 2. Site Plan.......................................................................................................................................1 <br /> 3. Groundwater Contours,January 19,2010..............................................................................2 <br /> 4. Groundwater Analytical Results,January 19,2010...............................................................3 <br /> 5. Water Level Hydrographs.........................................................................................on page 7 <br /> 6. Historic Soil Analytical Results................................................................................................8 <br /> 7. Historic TPHD Concentrations in Groundwater...................................................................8 <br /> 8. TPHD Concentrations vs.Time,Well MW-1........................................................on page 11 <br /> 9. TPHD Concentrations vs.Time,Well MW-2. ..on page 12 <br /> 10. TPHD Concentrations vs.Time,Well MW-3........................................................on page 12 <br /> 11. TPHD Concentrations vs.Time,Well MW-5........................................................on page 13 <br /> 12. TPHD Concentrations vs.Time,Well MW-6........................................................on page 13 <br /> Tables Page <br /> 1. Water Level Data,January 19,2010........................................................................................2 <br /> 2. Groundwater Analytical Results,January 19,2010..............................................................3 <br /> 3. Field Measured Parameters,January 19,2010.......................................................................3 <br /> 4. Natural Attenuation Parameter Comparison.............................................. .10 <br /> 5. Projected Time to Reach TPHD WQO..................................................................................14 <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> \\Eureka\projects\2007\007152-WOS\PUBS\rpt\20100324-istHaH2010GWMR&RFC.doc 4Y�T <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.