Laserfiche WebLink
PUBLIC HtALTH SERVR�"tS FILQ.. .. Py <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION X <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> Jeff Hopkins NOV 0 9 2000 <br /> Western Oil & Spreading Inc. <br /> PO Box 709 <br /> Martinez, CA 94553 <br /> MEMORANDUM <br /> Re: Western Oil and Spreading Site Code: 1927 <br /> 19256 N Hwy 99 <br /> Acampo, CA 95220 <br /> This letter is a memorandum of the telephone conversation with you on November 8,2000. <br /> San Joaquin County Public Health Services,Environmental Health Division (PHS/EHD) <br /> informed you that the Woriz n for Sod Gmwrk rater Oaaraaaiza�(the work plan) dated <br /> October 19,2000 prepared by D.K.Barber P.E. &Associates (Barber) is inadequate. The <br /> work plan failed to provide any information on what chemicals are to be analyzed for in the <br /> collected samples. The work plan also failed to specify the analytical methods to be used. <br /> PHS/EHD has repeatedly tried to contact Barber for comment. PHS/EHD has not been <br /> able to reach Barber to date. <br /> In the same telephone conversation,PHS/EHD recommended using the previously <br /> submitted Proposal Wakpla;Phase II Field Imestigaim dated February 16,2000,prepared by <br /> Kleinfelder as a guide to make up for the missing elements of the work plan by Barber. The <br /> work plan prepared by Kleinfelder was approved by PHS/EHD but was never <br /> implemented. The Kleinfelder work plan proposed analyzing soil and groundwater samples <br /> for Total Petroleum Hydrocarbon CIPH) -Extractable as Diesel by EPA Method 8015K <br /> TPH as Kerosene by EPA Method 8015K TPH Purgeable as Gasoline by EPA Method <br /> 8015K and Benzene,Toluene,Ethylbenzene,and Total Xylenes (BTEX collectively) by <br /> EPA Method 8020. PHS/EHD expressed to you that the Barber work plan would be <br /> acceptable if these components as described in the Kleinfelder work plan are followed. <br /> PHS/EHD confirmed with you that the deadline to implement the proposed work is the <br /> week of November 20,2000. <br /> C, <br /> Jeffrey ong,RENS <br /> LOP/Site Mitigation Unit IV <br /> c: RWQCB,Central Valley Region-Marry Hartzell <br /> c: Daniel K. Barber- 623 Camellia Way,Lodi 95242 <br /> A Division of San Joaquin County Health Care Services <br />