My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005448
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:27 PM
Creation date
4/8/2020 2:37:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005448
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 WELL INSTALLATION <br /> ' Monitoring well installation can be broken into seven main steps <br /> • Packing the 1 0-mch x 2 5-inch OD Well Screen with sand <br /> • Driving the probe rods to depth <br /> ' • Deploying the screen and riser pipes <br /> • Installing a sand/grout barrier <br /> • Installing a bentonite seal above the screen <br /> • Grouting the well annulus <br /> • Installing surface protection <br /> Size and material options have resulted in an extensive list of Geoprobe part numbers To simplify the instruc- <br /> tions presented in this document,part numbers are listed in the illustrations only Refer to "Section 3 0 Re- <br /> quired Equipment" for complete part descriptions <br /> 51 Packing the 1.0-in x 2 5-in OD Well Screen with Sand <br /> The 1 0-inch x 2 5-mch OD Well Screen can he packed with sand before arriving at the job site or at the <br /> job site However, to help make the well installation pro- <br /> cess more efficient,Geoprobe Systems recommends pack- <br /> ing all well screens with sand before mobilizing to the job 3 25-in Drive Cap <br /> site Each box of I 0-inch x 2 5-mch OD Prepack Screens (9742 or 10605) <br /> comes with a complete set of sand filling instructions In- <br /> structions for filling the screens with sand are described in <br /> Section 4 0 <br /> 52 Driving Probe Rods to Depth <br /> I Locate the Geoprobe probing machine over the proposed <br /> monitoring well Unfold the probe and place it in the 3 25-in Expendable <br /> proper probing position as shown in the unit Owner's Potnt Holder <br /> Manual Since access to the top of the probe rods is (13925 10599 <br /> ' required,it is important to allow room for derrick retrac- 9040) <br /> tion when positioning the unit for probing <br /> ' 2 Insert a 3 6-inch OD Expendable Point Assembly into <br /> the unthreaded end of a 3 25-inch Expendable Point <br /> Holder See Figure 5 1 <br /> ' 3 Place a 3 25-inch Drive Cap over the threaded end of the <br /> expendable point holder <br /> ' Expendable Point <br /> 4 Place the expendable point holder under the probe ham- 3 6-,n OD <br /> mer in the driving position (refer to unit Owner's (AT3215) <br /> Manual) Drive the point holder into the ground,using <br /> percussion if necessary To install an accurately placed <br /> monitoring well,it is important to drive the rod string as <br /> straight as possible If the point holder is not straight, FIGURE 5 1 <br /> retract the assembly from the ground and start over with Dnve Cap,Expendable Point Holder <br /> Step I and Expendable Point Assembly <br /> i <br /> Standard Operating Procedure Page 11 1 0-in x 2 5-in OD Prepack Screen Monitoring Well <br />
The URL can be used to link to this page
Your browser does not support the video tag.