Laserfiche WebLink
I <br /> lie 5 Remove the drive cap from the expendable point holder Install an O-ring on the point holder in the <br /> groove located at the base of the male threads(Fig 5 2) <br /> IMPORTANT: O-rings must be used to seal the 3.25-inch Probe Rod,joints. <br /> NOTE Make sure the O-ring groove and O-nng mating surface are clean Any foreign material located <br /> in these areas will prevent the O-ring from sealing properly. <br /> 6 Lubricate the O-nng and O-nng mating surface(Fig 5 3)with a small amount of clean water Apply <br /> the water with either a moist cloth or a spray bottle <br /> 7 Thread a 3 25-inch Probe Rod onto the expendable point <br /> 8 Place the drive cap on the probe rod and advance the rod string <br /> O-Ring Groove <br /> O-ring <br /> 3 25-in Probe Mating <br /> Rod or Surface <br /> Expendable Point -A <br /> Holder O_F2tng <br /> All <br /> (9960) <br /> FIGURE 5 2 FIGURE 5 3 <br /> Probe Rod O-Ring Groove Lubricating O-Ring and Mating Surface <br /> 9 Remove the drive cap Again,install an 0-ring in the probe rod's 0-ring groove Lubricate the 0-ring <br /> and the 0-ring mating surface(Fig 5 3) Add the next probe rod,replace the drive cap,and advance <br /> ' the rod string <br /> 10 Repeat Step 8 until the leading end of the rod string is 1 5 inches(3 8 cm)below the bottom of the <br /> desired screen interval The additional depth adjusts for the extra height created by the expendable <br /> point and the PVC Bottom Plug The top probe rod must also extend at least 15 inches;38 em)above <br /> the ground surface to allow room for the rod grip puller used later in this procedure (An additional <br /> rod may be added if necessary) Move the probe foot back to provide access to the top of the rod <br /> string <br /> 53 Deploying the screen and riser pipe <br /> 1 With the probe rods driven to the proper depth,the next step is to deploy the screen and riser pipe <br /> inspect the I 0-in x 2 5-m OD Prepack Screen(s)to make sure that <br /> ' a) the plastic plug is removed <br /> b) the stainless steel screws are snug(See Fig 5 4) <br /> ' Standard Operating Procedure Page 12 1 0-in x 2 5 in 00 Prepack Screen Monitoring Well <br />