Laserfiche WebLink
4.3 Budget and Cost Controls <br /> Budget and cost control information will be developed and maintained internally by <br /> WO&S for possible eventual submittal for reimbursement All cost information is <br /> considered confidential <br /> 1 44 Remediation Goals <br /> Soil and groundwater remediation goals will be identified following determination of <br /> affected water bodies' beneficial uses and impact that may be expected with various <br /> remediation and/or acceptance options <br /> I45 Additional Permits <br /> San Joaquin Valley Unified APCD emission standards will not be violated during the <br /> testing or remediation process A well drilling permit from San Joaquin County PHSIEHD <br /> will be required for each parcel bored, signed by the dnlling contractor <br /> 46 Final Report <br /> The Final Report will be prepared under the guidance of a licensed Civil Engineer to <br /> support a request for final closure consistent with Tri-Regional Guidelines The report will <br /> include <br /> (1) analytical results from sod and water samples during the Phase II characterization <br /> stage <br /> (2) figures delineating the actual lateral and vertical extent of impacted sod <br /> (3) a discussion of risk based remediation factors <br /> (4) chain-of-custody records for certified analytical analysis <br /> i (5) evaluation of the analytical results and a discussion of the <br /> findings of exploratory and possible remediation phases <br /> (6) recommendations incorporating findings leading to the site's closure <br /> ' Two copies will be forwarded to the overseeing agency or as requested <br /> 4-2 <br />