My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005451
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:27 PM
Creation date
4/8/2020 2:41:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005451
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> No C-5R) and contamination with heavier fractions (purgeable C6-C12) were <br /> found in soil between 25 and 40 FT bgs in BH Nos C-2 and C-4/6, ranging <br /> ' upwards to extractable petroleum hydrocarbons of 15,500 mg/kg at 25 FT bgs in <br /> BH No, C-517 <br /> t Groundwater was sampled when encountered in the boreholes MW No 1 was <br /> sampled on December 20, 2000 and March 30, 2001 A detectable level of <br /> BTEX of 0 500 ug/L was found in BH No C-416 Extractable hydrocarbons were <br /> ' idenbW in groundwater samples from BH Nos C-1, C-2, C-3, C-4, C-5 and MW-No 1 <br /> Ground water was sampled from the single monitoring well in December 2000, <br /> ' April 2001, January 2002, and April 2002 <br /> 1 <br /> 1 <br /> ' Recent Activity <br /> Following resumption of monitoring in 2002, it became apparent that additional <br /> characterization of contamination both on and off site would be required After <br /> conditional approval by your office (EHD), six borings of which five were <br /> ' converted to cased monitoring wells were constructed by Woodward Drilling <br /> Company during June 6 and 7, 2002 Soil was sampled and classified by Stellar <br /> Environmental Solutions, Inc geologist Fred Hayden RG and Dan Barber PE <br /> ' Del-Tech Geotechnical Support Services developed the monitoring wells and <br /> continues to collect samples from MW Nos 1-6 for delivery to Sequoia Laboratory <br /> for analysis <br /> ' Well Top of Casing (TOC) elevations were established to 0 01 FT accuracy and <br /> related to the datum of the surrounding Victor Fine Foods ground water <br /> monitoring program by Daniel K Barber P E <br /> General Findings to Date <br /> ' Soil source areas with remaining diesel contamination have been identified One <br /> of the contamination zones may extend into the adjacent eastern parcel from the <br /> ' original UST excavation area Significant and economically feasible to remove <br /> contamination exists between MW Nos 1 and 2 near the site's eastern property <br /> line fence <br /> 1 <br /> The site's groundwater flow, based on current Monitoring Well information is <br /> ' northward, at a gradient averaging 0 003 FT/FT declining at an average bearing <br /> Pg 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.