Laserfiche WebLink
NOTE Slide the probe rods over <br /> the tremae tube and place neatly on Geoprobe Grout Machine <br /> the ground next to the grout machine' (GS1000) <br /> (1 Plug Be careful to not pinch or bind the Plastic <br /> (13227) <br /> flexible tubing as this forms weak �1 <br /> spots which may burst when pressure <br /> ' is applied i <br /> I f 0 <br /> NOTE Try to avoid filling the up- <br /> per 12 inches (305 mm)of well an- 1 Fill Probe Rods <br /> nulus with grout when pulling the ex- with grout dot" <br /> bottom up <br /> pendable point holder This will 2 Continue <br /> ' make for a cleaner well cap installa- operating grout <br /> machine while <br /> tion mthdrawing rods <br /> 6 When all probe rods have been <br /> retrieved and the well is adequately Tremae Tube <br /> High solids (Fle)able Tubing <br /> grouted,unstring the tremie tube and Bentonite slurry 14299) <br /> begin cleanup It is important to forms well seal <br /> promptly clean the probe rods,grout Bentonite Seat <br /> machine, and accessories This is <br /> especially true of cement mixes as <br /> they quickly set up and are difficult Grout Barrier <br /> to remove once dried <br /> 57 Surface Cover/Well Protection <br /> A surface cover protects the P V C <br /> well riser from damage and tamper- <br /> ing Although aboveground and <br /> flush-mount well covers may be used, <br /> most Gcoprobe monitoring wells FIGURE 512 <br /> have been installed with flush-mount Grouting Well Annulus with <br /> covers (Pig 5 13) Consult the Geoprobe G51000 Grout Machine <br /> project planners and/or appropriate <br /> regulators to determine the approved <br /> well cover configuration for your specific application <br /> I In order to fit under a flush-mount cover,the top of the well riser must be below the ground surface <br /> Place the well cover over the riser and push it into the ground to mark the cover diameter Remove the <br /> cover and dig out approximately 6 inches(152 mm)of soil from within the cover mark <br /> ' 2 Remove the plug from the 1 0-inch PVC riser The top of the riser should be approximately 2 inches <br /> (51 mm)above the bottom of the hole if anoint is near this level,unthread the top rser if a joint is not <br /> positioned near the specified level,cut off the riser with PVC cutters Cut at a slight angle to make it <br /> easier to remove the plug Place a plug(13227)in the well riser Do not apply duct tape at this time <br /> NOTE- Do not cut off the riser with a hacksaw as cuttings will fall down into the screens <br /> ' Standard Operating Procedure Page 20 1 0-in x 2 5-in OD Prepack Screen Monitoring Well <br />