Laserfiche WebLink
1 <br /> Flush Mount Concrete Pad <br /> Well Cover Thickness ?4 0 in <br /> i <br /> J Plug PVC Pipe <br /> (Locking Plug) 2 0 in Sch 40 <br /> ' 24 in length <br /> Plastic Plug <br /> (13227) <br /> PVC Riser <br /> ' 1 ft l 5ch 40 <br /> 5 ft lengths <br /> (12876) <br /> High Solids Bentonite Slurry <br /> ' or Neat Cement Grout <br /> Bentonite Well Seal <br /> Thickness i 2 feet <br /> 1 <br /> Grout Barrier <br /> (20140 Sand or Collapsed <br /> Natural Formation) <br /> Thickness ?2 feet above top <br /> of screens <br /> 1 rein x 2 5-in OD <br /> Prepack WNI Screen <br /> PVC Bottom Plug <br /> (12881) <br /> ' Expendable Point 3 6 in OD <br /> (AT3215) <br /> FIGURE 513 <br /> Property installed Geoprobe 10 in x 2 5 in OD Prepack Screen Monitoring Well <br /> 3 Push a 24-inch(6 10 mm)section of 2-inch PVC pipe over the well riser Position the top of the 2-inch <br /> pipe 1 5 to 2 0 inches(38 to 51 mm)above the top of the riser This will provide adequate room to install <br /> ' the locking cap on the 2-inch pipe and still allow removal of the user cap <br /> 4 Insert the locking cap into the 2-inch PVC pipe Tighten the wing-bolt until the cap fits snugly <br /> 5 Position the well cover so that it is centered over the PVC pipe Push the cover into the ground using <br /> the foot of the probe unit if needed Provide at least 0 5 inches(13 mm)of space between the top of the <br /> locking cap and bottom of the well cover lid Do not push the cover so deep as to place the top of the lid <br /> below the surrounding ground surface <br /> Standard Operating Procedure Page 21 1 rein x 2 5-in OD Prepack Screen Monitoring Well <br />