1 <br />' borings BH Nos C-4/C-6 and C-5/C-7 indicated a lighter extractable C10-C-28 <br /> fraction The bonngs were grouted closed after collecting samples and could not be <br /> retested Chromatograms from laboratory analysis were submitted in the June 2002 <br /> interim report along with complete laboratory reports The most recent March 2005 <br /> sampling laboratory findings are included herewith Reference ATTACHMENT 4, <br /> 1 EXTRACTS FROM ANALYTICAL LABORATORY FINDINGS- December 2005 <br /> During the December 2005 sampling, the "diesel" fraction was detected at levels <br /> ' between <0 05 and 0 79 mg/Itr Level in MW No 1, the original MW installed in <br /> December 2000, had continued to increase from 0 47 mg/Itr recorded in March 2004 <br /> to 0 86 mg/Itr in December 2004 but has decreased to 0 82 mg/ltr Levels in MW No <br /> ' 2 decreased from 0 33 mg/ltr recorded in December 2004 but rebounded upwards to <br /> 0 51 mg/ltr Results are listed separately in the last page of the ATTACHMENT 2, <br /> "SITE CHARACTERIZATION -SUMMARY OF LAB RESULTS <br /> Soil Quality <br /> Shallow trenching in November 2004 revealed that oil contamination from petroleum <br /> hydrocarbons was found in several areas of varying depth and concentrations Levels <br /> of BTEX were detected in previous exploration in the 10 to 15 FT bgs zone along the <br /> east fence at less than 100 ug/kg and at a deeper 25 FT bgs at levels of 688 ug/kg of <br /> Xylene During earlier testing in March 1999, Galardo identified considerable BTEX in <br /> BH No B-1 in the vicinity of later installed MW No 1 and in BH No 2 near the east <br /> fence <br /> Diesel contaminated soil was found near MW No 4 particularly in the 25 to 30 FT bgs <br /> zone and MW No 2 near the east fence in June 2002 Earlier borings by Gallardo and <br /> Barber found diesel at the 13,000 to 15,000 mg/kg levels in the same area <br /> Earlier borings by Gallardo and Barber found concentrations of upwards to 30,000 <br /> mg/kg in the vicinity of MW No 1 and BH No B-1 at similar depths <br /> ' Review of previous geological findings and field findings in June supported the <br /> contention that there was dispersion of diesel in the 25 FT to 35 FT bgs zone atop an <br /> aquatard, possibly with earlier perched waters Perched waters were not found at this <br /> Idepth by Stellar or Barber in December 2000 or the later June 2002 exploration <br /> Near the east fence during construction of MW No 2 in June 2002, minor seepage of <br /> product (diesel like) and shallow water were apparent in the upper 0 to 10 FT bgs <br /> stratum <br /> ' Recent Soil Contamination Findings During Shallow Excavations <br /> Shallow sod was sampled November 22, 2004 between the existing AST (MW No 1 <br /> ' and the eastern property line including the area surrounding MW No 2 Results are <br /> • attached as a separate summary Diesel and motor oil fractions were found ranging <br /> between 6 mg/kg to as high as 14,000 mg/kg Trenching, by WOS, in the area <br /> ' between MW No 2 (east fence line and the concrete block wall secondary <br /> 4 <br />