Laserfiche WebLink
First Phase: <br /> • 11 soil borings 20' below ground surface (bgs) <br /> • 7 Cone Penetration Test (CPT) borings to maximum 75' bgs <br /> Second Phase: <br /> • Install 4 groundwater monitoring wells to a depth of 20' bgs <br /> Parcel : 06605030 <br /> First Phase: <br /> • 3 soil borings 20' below ground surface (bgs) <br /> • 3 Cone Penetration Test(CPT) borings to maximum 75' bgs <br /> Second Phase: <br /> • Install 2 groundwater monitoring wells to a depth of 20' bgs <br /> I am getting bids currently from drillers to execute this work. Lets plan on using the same drilling subcontractor for both <br /> Phases of work. Can you please provide a quote for permit costs for both phases on each parcel. Thank you for your <br /> time. <br /> Sincerely, <br /> Gavin M.Creps <br /> Senior Staff Engineer, E.I.T. <br /> isPES Environmental, Inc. <br /> 00"Wing 6 EA.irorc wts <br /> 7665 Redwood Boulevard,Suite 200 <br /> Novato,California 94945 <br /> Office:415.899.1600 <br /> Cell:415.497.2736 <br /> Fax:415.899.1601 <br /> Note that we have recently moved to the address above. Please update your records. <br /> From: Nuel Henderson [EH] [mailto:nhendersonColsicehd.com] <br /> Sent: Tuesday, January 24, 2017 8:22 AM <br /> To: Gavin M. Creps <br /> Subject: RE: Paradise Point Marina - Boring Permit Application <br /> Gavin, <br /> I need a bit more information to answer your question.We issue permits by parcel; are all these borings and wells on <br /> the same parcel? If not,what is the distribution of the borings and wells on the parcels?Also,we issue permits by <br /> contractor,will the same driller be putting in all these borings and well?, If not,again, what is the distribution? <br /> Nuel <br /> From: Gavin M. Creps [mailto:GCreos@Pesenv.com] <br /> Sent: Monday,January 23, 2017 5:17 PM <br /> To: Nuel Henderson [EH] <nhenderson(a)sicehd.com> <br /> Subject: Paradise Point Marina - Boring Permit Application <br /> Nuel, <br /> 9 <br />