Laserfiche WebLink
r <br /> PES Environmental, Inc. <br /> Ms. David Carr <br /> May 31, 2017 <br /> Page 2 <br /> As discussed in the Work Plan Addendum, a report will be prepared to document the <br /> investigation findings and identify groundwater monitoring well locations. There is potential <br /> for wells to be located within the levee template and toe. Per RD's request, PES will provide <br /> the report for review and comment. <br /> If you have any questions or require additional information, please contact us at (415) 899- <br /> 1600. <br /> Very truly yours, <br /> PES ENVIRONMENTAL, INC. <br /> Gavin M. Creps, E. <br /> Senior Staff Engi er <br /> j a, 0 <br /> William M. Mast, P.G. <br /> Principal Engineer <br /> Attachments <br /> Plate 1: Site Location <br /> Plate 2: Proposed Soil, Groundwater and CPT Borings <br /> RWQCB letter dated January 19, 2017 <br /> 148400101ino4.dm <br />