Laserfiche WebLink
Mr. Mike Infurna <br /> Page 3 of 3 <br /> Reporting <br /> A technical report will be prepared that summarizes field activities and the findings of the <br /> investigation. The report will include an evaluation of the magnitude of contamination, if any, and <br /> will propose appropriate steps to further define or remediate the contamination as appropriate. <br /> Protocols <br /> Drilling and sampling equipment will be washed thoroughly with laboratory-grade detergent and <br /> water between uses to minimize the potential for cross contamination. Drill cuttings will be <br /> placed back into the respective shallow bore-hole. All fieldwork will be conducted in accordance <br /> with our Quality Assurance/Quality Control and Field Procedures Plan (included as Attachment <br /> B) and the Site Safety Plan (Attachment C). <br /> Please feel free to contact Ground Zero at (209) 838-9888 if you have any questions or comments <br /> regarding this workplan. <br /> Respectfully, <br /> Ground Zero Analysis, Inc. <br /> Joseph L. Vasquez <br /> Staff Geologist <br /> rr JOHN P. —� <br /> ` J LANL o <br /> John P. Lane No. 6795 <br /> CA Registered Geologist No. 6795 ,moi <br /> Attachments <br />