Laserfiche WebLink
4 <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: <br /> All contaminated personal protective equipment (i.e., gloves, coveralls) will be placed on and covered <br /> with 6-mil plastic sheeting. <br /> Location of Wash Water: At site. <br /> Location of Toilet: At site. <br /> Location of Drinking Water: At site. <br /> MARK LOCA TION OF EYEWASH AND SHOWER DRENCH ON SITE MAP L7 CHECK WHEN DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium phosphate <br /> solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- <br /> site as per the appropriate Federal and State <br /> regulations until proper disposal methods have <br /> been determined. <br /> EMERGENCY RESPONSE <br /> In case of an emergency, the branch/corporate safety officer must be notified by the site safety <br /> officer or project manager. The site safety officer or her/his alternate will notify outside emergency <br /> response agencies (ER) as needed, the branch/corporate safety officer, and the project <br /> supervisor/manager. The branch/corporate safety officer will make any required reports to local, <br /> state, and federal agencies. Other emergency notifications will include: <br /> ER Agency: Fire/Police Depts. Phone: 911 <br /> ER Agency: Ambulance Phone: 911 <br /> Site Safety Officer: Anthony Scoma On-site Phone: 209/470-3482 <br /> Pager No. 209/567-8402 <br /> Site Safety Alternate: John Lane Office Phone 209/838-9888 <br /> Corporate Safety Manager: John Lane Office Phone: 209/838-9888 <br /> Project Manager: John Lane Office Phone: 209/838-9888 <br /> Pager No. <br /> PAGE 11 <br />