Laserfiche WebLink
dated June 28, 2005 to conduce the sludge sampling. Pursuant ro our <br /> telephone conversation on July 11th, Mr. Van Spronsen was advised that <br /> the sludge should be returned to the subject property prior to <br /> sampling. On July 12th, Mr. Van spronsen placed the desiccated sludge <br /> in several 5-gallon pails, which were transported to Escalon and <br /> returned to the Miller Avenue Site. <br /> Ground Zero is prepared to collect composite samples from the sludge at <br /> your convenience pursuant to the June 28, 2005 workplan. <br /> Please respond at via email or other correspondence with a sampling <br /> schedule and/or other recommended actions. <br /> Respectfully, <br /> John Lane <br /> Ground Zero Analysis, Inc. <br /> 1714 Main Street <br /> Escalon, CA 95320-1927 <br /> (209) 838-9888 Phone <br /> (209) 838-9883 Fax <br /> 2 <br /> rnNIFI <br /> [71k T1. � <br />