Laserfiche WebLink
• ADDITIONAL ACTIVITIES PERFORMED AT SITE <br /> 1 A Work Plan for Chemical Oxidation Pilot Study dated July 2005 was submitted to the San Joaquin <br /> County Environmental Health Division (SJCEHD) and Regional Water Quality Control Board <br />' (RWQCB) After comments from the SJCEHD and RWQCB were addressed, the work plan was <br /> approved, and the oxidant injection field pilot test was implemented beginning in October 2005 The <br /> pilot test is ongoing, and the results of the test will be submitted under separate cover <br /> 1 <br /> WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater will be monitored in accordance with the attachedoundwater m mtonn plan <br /> �' o g <br /> The oxidant infection pilot test is ongoing,and the results of the test will be submitted under separate <br /> cover <br /> Attachments <br />' Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br /> Figure 2 Site Map Showing Offsite Groundwater Monutoring Well Locations <br /> Figure 3 Influent TPH-g Concentrations and Estimated Mass ofTPH-g Removed by UVB <br /> System <br /> lie Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br /> LJVB System <br /> Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br />' Table 3 Groundwater Momtonng Plan <br /> Table 4 Operation and Performance Data - LTVB System <br />' Table 5 Summary of Analytical Results - UVB System <br /> Appendix A Field Protocols <br />' Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br />' g 5pro7ecu\73942\TmicTlwplq 1205L3942text die 5 <br />