Laserfiche WebLink
' ADDITIONAL ACTIVITIES PERFORMED AT SITE <br /> A Work Plan for Chemical Oxidation Pilot Study dated July 2005 was submitted to the SJCEHD and <br />' RWQCB After comments from the SJCEHD and RWQCB were addressed, the work plan was <br /> approved,and the oxidant injection field pilot test was implemented beginning in October 2005 The <br /> pilot test is ongoing, and the results of the test will be submitted under separate cover <br />' WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br />' The oxidant infection pilot test is ongoing, and the results of the test will be submitted under separate <br /> cover <br /> I <br /> Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br /> Figure 2 Site Map Showing Offsite Groundwater Monitoring Well Locations <br /> Figure 3 Influent TPH-g Concentrations and Estimated Mass of TPH-g Removed by UVB <br /> System <br /> Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br /> UVB System <br /> Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br /> Table 3 Groundwater Monitoring Plan <br /> Table 4 Operation and Performance Data- UVB System <br />' Table 5 Summary of Analytical Results -UVB System <br /> Appendix A Field Protocols <br /> Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br /> I <br /> 9 tipmJects173942\7�tctlwp1g100513942text doc 5 <br />