My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006120
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
ARCHIVED REPORTS_XR0006120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:15:36 PM
Creation date
4/10/2020 2:07:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006120
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Soil vapor extraction and air sparging system: <br /> A soil vapor extraction/air sparging (SVE/AS) system operated from 1994 to 1996 and recovered <br /> petroleum hydrocarbon vapors from wells MW2, MW3, MW5, MW6, V1, V2, and V4 in <br /> conjunction with air sparging wells SW 1 and SW2 A total of approximately 14,500 pounds of <br />' petroleum hydrocarbons was removed from the vadose zone by the SVE/AS system The SVE <br /> influent concentration and the cumulative estimated pounds of TPH-g removed became asymptotic <br />' over time <br /> Perozone Injection System and Soil Vapor Extraction <br />' An oxidation pilot test using ozone and hydrogen peroxide(perozone)began in October 2005 and is <br /> ongoing Ozone and hydrogen peroxide are injected into the saturated soils using injection wells <br />' <br /> PIA, IP1B, IP2A, IP2B, IP3A, and IP3B To monitor the injection system, dissolved oxygen <br /> concentrations, pH, ORP, temperature, and pressure influence are being measured from various <br /> observation wells located onsite Groundwater samples from injection and observation wells are also <br />' being analyzed for petroleum hydrocarbons and water quality parameters <br /> As some hydrocarbons may be volatilized due to the perozone injection during the field study, the <br />' existing SVE system is being used to abate hydrocarbons and/or ozone in the vadose zone The <br /> existing SVE system is capable of extracting soil vapors from wells MW2,MW3,MW5,MW6,V1, <br /> V2, and V4 Soil vapors are extracted using a regenerative blower, and treated with two 2,000- <br /> pound activated carbon vessels in series <br /> The results of the pilot study, inclusive of operational parameters for both the injection system and <br />' SVE system,as well as groundwater analysis for hydrocarbons and groundwater parameters,will be <br /> submitted under separate cover <br /> I <br /> G Trolects1739421PUBLICID&_WQuarterly Pmgress RepWr 2005L3942 Q1045_syvem doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.