Laserfiche WebLink
1• 4. REPORTING AND SCHEDULE <br />' The results of the proposed pilot test will be presented in a technical report The report will <br /> include an assessment of the impact of oxidants on both groundwater quality and hydrocarbons <br /> at the site The pilot test is proposed to start in August 2005 A proposed timetable for <br />' implementing the proposed pilot test is included in Table 2 Implementation of the proposed <br /> Pilot test is contingent upon regulatory approval <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> • <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> • <br /> 1 <br /> 0\Pro}ects173942\MASTER\WP\WP0705\Ozone Injection Pilot Tm Work Plan doc <br /> 1 9 <br />