Laserfiche WebLink
CEO-95-007_pp <br /> REMEDIAL ACTION PLAN PROCESS* APPENDIX 'I <br /> Draft Remedial Action Plan <br /> submitted to DTSC <br /> 'DTSC Review Proposed NBAR Public Notice Fact Sheet (double-spaced .text) <br /> .submitted to DTSC submitted to DTSC submitted to DTSC <br /> If rejected DTSC provides <br /> If we can <br /> work with annotated comments <br /> i <br /> DTSC provides written RP/PP submits revised fac <br /> Annotated comments Sheet <br /> comments provided to RP/PP <br /> Revised RAP Pages submitted if not <br /> RP/PP submits Revised approved <br /> DTSC Review <br /> notice if approved <br /> If changes not Public Comment Period Mock-up submitted to DTSC <br /> acceptable, During this process and Meeting Date Set <br /> DTSC may request <br /> diskette to <br /> take over DTSC approves <br /> preparation. <br /> If changes approved DTSC prepares Fact Sheet Printed <br /> MBAR for inclusion <br /> in draft RAP <br /> 3 copies of draft RAP (include with draft RP/PP publishes Fact Sheet mailed by RP/PP <br /> submitted RAP approval letter public notice in to Community Mailing list <br /> for inclusion in the local newspapers(s) to arrive by the start <br /> DTSC reviews to ensure Statement of Reasons of the public comment <br /> changes incorporated in the draft RAP) period. <br /> DTSC provides approval letter <br /> ,al <br /> RP/PP mails out copies of draft <br /> RAP with approval letter by <br /> overnight mail to <br /> 1) parties named in NBAR/Order <br /> 2) Information Repositories <br /> Must arrive by day 1 of public <br /> comment period <br /> 30-day public Final RAP <br /> comment period and Notice <br /> public meeting submitted to <br /> DTSC <br /> Responsiveness Summary is if not <br /> prepared to address comments ants approved, <br /> received. RP/PP to assist DTSC provides <br /> with response to technical annotated <br /> .`questions. <br /> 1 comments <br /> DTSC sends out letter of if approved, <br /> required modifications to notice finalized <br /> the RAP for finalization. <br /> 1 ' <br /> 3 copies of <br /> Final RAP submitted to OTSC <br /> DISC issues letter RP/PP placesPublic Notice in <br /> approving final RAP newspaper announcing <br /> 1 RAP finalization <br /> Copies of approval letter <br /> and Final RAP sent by <br /> overnight mail to parties <br /> named in NEAR and info. <br /> repositories and by regular <br /> mail to rest of parties required <br /> in Order. <br /> 'A Negative Declaration, if appropriate, for the proposed remedial action is submitted to DTSC within 45 days of the approval <br /> date of the Feasibility Study, together with a copy of the document on diskette. DTSC will then take over the preparation <br /> and finalization of the Negative Declaration. RP may be required to assist with technical information. <br />