Laserfiche WebLink
FROM Ground. Ee-^c Ar8lySi$ PHONE HO. . 209 952 9992 Jun. 05 199' 02:25PI'I P4 <br /> ATTACHMENT A <br /> COST ESTIMATE FOR SUPPLEMENTAL SOIL SAMPLING <br /> and <br /> SOIL TREATMENT BENCH TESTING <br /> Roy's Towing <br /> 3570 East Miner Avenue, Stockton <br /> Labor (Remedial Qptions Rewnrah/ Soil Sampling/Bench Testing) <br /> Registered Geologist 10 hrs $ 95/hr $ 950 <br /> Staff Geologist 4 hrs 65/hr 260 <br /> Technician 6 hrs 45/hr 270 <br /> SUBTOTAL: $ 1.480 <br /> Lab=Wry <br /> Lateral delineation-STLC Pb 6 a 83;sample 498 <br /> "Vertical delineation-STLC Pb 3 a 83/sample 249 <br /> Treatment control-STLC Pb/D1' STLC 1'b/TCLP Pb/ph 1 (p 265/sample 265 <br /> Post-Treatment - STLC Pb/pH 4 a 100/sample 400 <br /> SUBTOTAL: $ 1,412 <br /> EQuipmen <br /> Testing Equip. and Materials 500 <br /> County fee for inspector 400 <br /> SUBTOTAL- $ 900 <br /> Workplan. Re rt & Negotiations with Co. and DA <br /> SUBTOTAL: $ 1.00U <br /> TOTAL COST ESTIMATE: <br /> BroundaalioY'xpwlopreest <br />