Laserfiche WebLink
ROY'S TOWING Page 2 <br /> Hrs/Rate Amount <br /> 5/28/97 G.S. LABOR: 0.80 76.00 <br /> CALLS TO KOVR 13; CORRESPOND WITH MILLER. 95.00/hr <br /> 6/5/97 G.S. LABOR: 1.50 142.50 <br /> SOIL TREATMENT SPECS. 95.00/hr <br /> 6/19/97 G.S. LABOR: 4.00 380.00 <br /> REPORT PREPARATION r ND CORRESOND WITH L.B. 95.00/hr <br /> AND C.K. <br /> 6/20/97 G.S. LABOR: 0.20 19.00 <br /> CORRESPOND WITH CAI.@ DTSC REGARDING LEAD 95.00/hr <br /> TREATMENT STANDARDS. <br /> 6/24/97 G.S. LABOR: 0.80 76.00 <br /> PLAN ADDITIONAL FIELD WORK. 95.00/hr <br /> G.S. LABOR: 0.30 28.50 <br /> REVIEW COURT RULINGS. 95.00/hr <br /> 6/27/97 G.S. LABOR: 0.30 28.50 <br /> PLAN ADDITIONAL FIELD WORK. 95.00/hr <br /> 7/9/97 G.S. LABOR: 0.80 76.00 <br /> CORRESPOND WITH MRS. KNOLL AND P. RIDDLE 95.00/hr <br /> REGARDING CALTRANS ISSUE. <br /> 7/10/97 G.S. LABOR: 0.30 28.50 <br /> CORRESPOND WITH MRS. KNOLL AND P. RIDDLE 95.00/hr <br /> REGARDING CALTRANS ISSUE. <br /> 7/11/97 G.S. LABOR: 0.30 28.50 <br /> CORRESPOND WITH MRS. KNOLL AND P. RIDDLE 95.00/hr <br /> REGARDING CALTRANS ISSUE. <br /> 7/17/97 G.S. LABOR: 0.20 19.00 <br /> PROJECT MANAGEMENT 95.00/hr <br />