My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_ROY'S AUTO - HISTORICAL (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3570
>
2900 - Site Mitigation Program
>
PR0527444
>
ARCHIVED REPORTS_ROY'S AUTO - HISTORICAL (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 4:45:36 PM
Creation date
4/10/2020 4:19:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
ROY'S AUTO - HISTORICAL
RECORD_ID
PR0527444
PE
2950
FACILITY_ID
FA0018586
FACILITY_NAME
FORMER ROY KNOLL TOWING
STREET_NUMBER
3570
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339014
CURRENT_STATUS
01
SITE_LOCATION
3570 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROY'S TOWING Page 2 <br /> Hrs/Rate Amount <br /> 5/28/97 G.S. LABOR: 0.80 76.00 <br /> CALLS TO KOVR 13; CORRESPOND WITH MILLER. 95.00/hr <br /> 6/5/97 G.S. LABOR: 1.50 142.50 <br /> SOIL TREATMENT SPECS. 95.00/hr <br /> 6/19/97 G.S. LABOR: 4.00 380.00 <br /> REPORT PREPARATION r ND CORRESOND WITH L.B. 95.00/hr <br /> AND C.K. <br /> 6/20/97 G.S. LABOR: 0.20 19.00 <br /> CORRESPOND WITH CAI.@ DTSC REGARDING LEAD 95.00/hr <br /> TREATMENT STANDARDS. <br /> 6/24/97 G.S. LABOR: 0.80 76.00 <br /> PLAN ADDITIONAL FIELD WORK. 95.00/hr <br /> G.S. LABOR: 0.30 28.50 <br /> REVIEW COURT RULINGS. 95.00/hr <br /> 6/27/97 G.S. LABOR: 0.30 28.50 <br /> PLAN ADDITIONAL FIELD WORK. 95.00/hr <br /> 7/9/97 G.S. LABOR: 0.80 76.00 <br /> CORRESPOND WITH MRS. KNOLL AND P. RIDDLE 95.00/hr <br /> REGARDING CALTRANS ISSUE. <br /> 7/10/97 G.S. LABOR: 0.30 28.50 <br /> CORRESPOND WITH MRS. KNOLL AND P. RIDDLE 95.00/hr <br /> REGARDING CALTRANS ISSUE. <br /> 7/11/97 G.S. LABOR: 0.30 28.50 <br /> CORRESPOND WITH MRS. KNOLL AND P. RIDDLE 95.00/hr <br /> REGARDING CALTRANS ISSUE. <br /> 7/17/97 G.S. LABOR: 0.20 19.00 <br /> PROJECT MANAGEMENT 95.00/hr <br />
The URL can be used to link to this page
Your browser does not support the video tag.