Laserfiche WebLink
ROY'S TOWING Page 3 <br /> Hrs/Rate Amount <br /> 7/23/97 G.S. LABOR: 1.30 123.50 <br /> WORK REQUEST FOR SAMPLING/SCHEDULE. 95.00/hr <br /> 7/25/97 G.S. LABOR: 0.40 38.00 <br /> WORK REQUEST FOR SAMPLING/SCHEDULE 95.00/hr <br /> 7/28/97 G.S. LABOR: 1.80 171.00 <br /> SUPERVISE SOIL SAMPLING 95.00/hr <br /> G.S. LABOR: 0.50 47.50 <br /> CORRESPOND WITH TECHNICIAN; REVIEW ATIL`' 95.00/hr <br /> APPROVE COC. <br /> A.S. LABOR: 1.00 45.00 <br /> PREP/LOAD EQUIPMENT FOR FIELD WORK. 45.00/hr <br /> A.S. LABOR: 1.50 67.50 <br /> TRAVEL/SAMPLE TRANSPORT 45.00/hr <br /> A.S. LABOR: 3.00 135.00 <br /> SOIL SAMPLING 45.00/hr <br /> 7/29/97 G.S. LABOR: 0.30 28.50 <br /> CALLS TO WSP FOR POZZOLAN 95.00/hr <br /> G.S. LABOR: 0.30 28.50 <br /> CALLS TO APPL LABS 95.00/hr <br /> G.S. LABOR: 0.20 19.00 <br /> DESIGN POZZOLAN MIX. 95.00/hr <br /> 7/30/97 G.S. LABOR: 0.20 19.00 <br /> CALLS TO APPL LABS. 95.00/hr <br /> For professional services rendered: 26.70 $2,255.50 <br />