My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3570
>
2900 - Site Mitigation Program
>
PR0527444
>
COMPLIANCE INFO_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 4:47:33 PM
Creation date
4/10/2020 4:32:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
CASE 1
RECORD_ID
PR0527444
PE
2950
FACILITY_ID
FA0018586
FACILITY_NAME
FORMER ROY KNOLL TOWING
STREET_NUMBER
3570
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339014
CURRENT_STATUS
01
SITE_LOCATION
3570 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.4 Paving <br /> The treated area will be capped with a multimedia layer consisting of a commercial mix of <br /> asphaltic concrete and a polypropylene fabric ("Petromat" of equivalent). The fabric is <br /> specifically designed to prolong the service life and enhance the structural integrity of flexible <br /> pavements by reducing cracking and preventing infiltration of surface water into subgrade <br /> material. The fabric is impregnated with liquid asphalt malting it less permeable and creating <br /> a flexible bond between asphalt layers. Laboratory test results indicate that a multimedia cep <br /> consisting of two IIA inch layers of asphalt separated by the fabric should achieve a permeability <br /> of 10'em/sec or loss. <br /> The multimedia cap would be constructed according to the manufacurer's specifications. The <br /> ground surface will first be sprayed with paving ail. Then an initial 1'h-inch lift of asphalt will <br /> be applied to the ground surface. The surface will be prepped for placement of the fabric. The <br /> layer of fabric will be placed and sprayed with liquid asphalt as spezified by the manufacturer. <br /> The second lift of asphalt, 1'h-inch in thickness,will then be installed for a total cap thickness <br /> of 3 inches. The surface will be sloped to direct surface drainage away from the building and <br /> towards Miner St, The area to be capped is depicted on Figure 3. <br /> 11.5 Health and Safety Plan <br /> A Health and Safety Plan prepared by Ground Zero Analysis was submitted to San Joaquin <br /> County Public Health Services,Environmental Health Division at an attachment to(lie Workplan <br /> for Solt Sampling of Roy's Towing dated September 30, 1996. <br /> 'ne Health and Safety Plan was developed specifically for activities related to investigation and <br /> remexiiation of soils at the subject site. The plan was based on the requirements of 29 CFR <br /> 1910.120, 'Hazardous Waste Operations and Emergency Responses'. <br /> This Health and Safety Plan will remain in force and all contractors will be required to comply <br /> with its provisions during any site activities involving potential exposure to hazardous <br /> substances. Personnel involved in site activities potentially involving exposure to Hazardous <br /> waste will be required to have completed the 40 hour training specified in 29 CFR 1910. <br /> The potential generation of dust during site activities will be minimized by the application of <br /> water to the soil. <br /> 11.6 cost <br /> The estimated cost to implement the selected rented015,100. <br /> $ <br /> Attachment I contains details <br /> on the preliminary cost estimate. <br /> �.m 10 <br /> 71d Wb6T:©T 866; C; •unr 2566 6E6 602 : 'GJ 3HOHd sIsRivud ole£ purouo Wpdd <br />
The URL can be used to link to this page
Your browser does not support the video tag.