Laserfiche WebLink
or monitoring prop—ms) ; er=': SSP must make it clear who will be providing <br /> these services. <br /> Regardless of the methodology used, TSCD must have SSP's that address all <br /> aspects of the project. It may be one "umbrella" plan, or the contractor may <br /> have each subcontractor submit their own SSP for the site. A project will <br /> not c mTence until all relevant SSP's are approved by a TSM industrial <br /> hygienist. <br /> II. SSP OUI= <br /> 1. Facility Background/Workplan <br /> 2. Key Personnel and Responsibilities <br /> 3. Job Hazard Analysis <br /> 4. Job Hazard Summary <br /> 5. Exposure Monitoring Plan <br /> 6. Personal Protective Equipment and Engineering Controls <br /> 7. Site Control (Work Zones and Security Measures) <br /> 8. Decontamination Procedures <br /> 9. General Safe Work Practices <br /> 10. Sanitation <br /> 11. Standard Operating Procedures <br /> 12. contingency Plans <br /> 13. Training Requirements <br /> 14. Medical Surveillance Program <br /> 15. Documentation <br /> III. GUIDANCE INFORMATION <br /> References to 29 CFR 1910.120 will be as follows: Interim Final Rules <br /> front 19 Dec 1986 will be noted "IFR"; Proposed Rules from 10 Aug 1987 <br /> will be noted "PR". For example, a reference to the 40-hour training <br /> requirement in the Interim Final Rules will be noted as [IFR (e) (2) ] . <br /> 1. Facility Background/Workplan [PR (b) (1) (iii) and (c) (3) ] <br /> This section of the SSP provides a description of the project, <br /> including work tasks, objectives, and personnel requixw ents; if in a <br /> subcontractor's SSP, it will- be specific to that sub's role in the <br /> project. It must include a summary of information regarding wastes <br /> disposed of on-site, their location, physical state, chemical <br /> characteristics, and range of concentrations found to date by matziy- <br /> Condensed SSP's that are used for graining and quick reference should <br /> also contain this information. <br /> 2. Key Personnel and _Responsibilities [PR (b) (ii) and (iv) (A) (1) ] <br /> In this se—ion, identify key personnel by name (if )mown) and specific <br /> assignment for the proje= (i.e. , Joe Smith, Project Manager; Harry <br /> Jones, Site Safety Officer, etc.) . Summarize the operational and health <br /> and safety r=.sponsibili-ies of eact key person identified. Include the <br /> reporting relationships of all personnel, the extent of the Site Safety <br /> Officer's (SSO) auzhority to correct health and safety problems and the <br /> overall project responsibilities of the SSO (what the SSO will be doing <br /> - 6 - <br />