Laserfiche WebLink
01 August 2019 AdvancedGeo <br /> AGE Project No. 05-1278 Environmental <br /> Page 2 of 23 -� <br /> 1.4.2. Preventative Maintenance <br /> Facility personnel perform preventive maintenance of equipment, secondary containment <br /> systems, and discharge prevention systems described in this Plan as needed to keep <br /> them in proper operating conditions. <br /> 1.4.3. Employee Training <br /> The Emergency Coordinator or designated Facility employee (Coordinator) responsible <br /> for SPCC conducts annual employee training as outlined in the Personnel, Training, and <br /> Spill Prevention Procedures section of this Plan (Section 3.8); training records which have <br /> documented compliance with the permit will be made available or attached in Appendix C. <br /> 1.4.4. Discharge Reporting <br /> If either of the following should occur, the Plan is submitted to the local enforcement <br /> agency designated as the San Joaquin County Environmental Health Department (EHD), <br /> the United States Environmental Protection Agency Region 9 Regional Administrator <br /> (EPA-RA) and the California Environmental Protection Agency (CAL-EPA), along with <br /> other information as detailed in Section 5.4 of this Plan: <br /> • The Facility discharges more than 1,000 gallons of oil into or upon the navigable <br /> waters of the U.S. or adjoining shorelines in a single spill event. <br /> • The Facility discharges oil in quantity greater than 42 gallons in each of two spill <br /> events within any 12-month period. <br /> 1.4.5. Plan Review <br /> Plan review is conducted at least once every five (5) years and amended to include more <br /> effective prevention and control technology, if such technology will significantly reduce <br /> the likelihood of a spill event and has been proven effective in the field at the time of the <br /> review. Plan amendments, other than administrative changes discussed above, are <br /> evaluated for re-certification by Facility Management/Coordinator and if deemed <br /> necessary, by a Registered Professional Engineer (PE). PE Plan certification is provided <br /> on the certification page located prior to the table of contents of this Plan. <br /> 1.4.6. Amendment Re-Certification Time Frame <br /> The Coordinator oversees amendments to this Plan within six (6) months, whenever there <br /> is a change in Facility design, construction, operation, or maintenance that materially <br />