My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2231-2238 – Tiered Permitting Program
>
PR0515788
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:28:51 PM
Creation date
4/10/2020 5:18:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515788
PE
2832
FACILITY_ID
FA0000482
FACILITY_NAME
3 b's truck & auto plaza
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
000-027-346-4
CURRENT_STATUS
01
SITE_LOCATION
14749 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01 August 2019 AdvancedGeo <br /> AGE Project No. 05-1278 Environmental <br /> Page 2 of 23 -� <br /> 1.4.2. Preventative Maintenance <br /> Facility personnel perform preventive maintenance of equipment, secondary containment <br /> systems, and discharge prevention systems described in this Plan as needed to keep <br /> them in proper operating conditions. <br /> 1.4.3. Employee Training <br /> The Emergency Coordinator or designated Facility employee (Coordinator) responsible <br /> for SPCC conducts annual employee training as outlined in the Personnel, Training, and <br /> Spill Prevention Procedures section of this Plan (Section 3.8); training records which have <br /> documented compliance with the permit will be made available or attached in Appendix C. <br /> 1.4.4. Discharge Reporting <br /> If either of the following should occur, the Plan is submitted to the local enforcement <br /> agency designated as the San Joaquin County Environmental Health Department (EHD), <br /> the United States Environmental Protection Agency Region 9 Regional Administrator <br /> (EPA-RA) and the California Environmental Protection Agency (CAL-EPA), along with <br /> other information as detailed in Section 5.4 of this Plan: <br /> • The Facility discharges more than 1,000 gallons of oil into or upon the navigable <br /> waters of the U.S. or adjoining shorelines in a single spill event. <br /> • The Facility discharges oil in quantity greater than 42 gallons in each of two spill <br /> events within any 12-month period. <br /> 1.4.5. Plan Review <br /> Plan review is conducted at least once every five (5) years and amended to include more <br /> effective prevention and control technology, if such technology will significantly reduce <br /> the likelihood of a spill event and has been proven effective in the field at the time of the <br /> review. Plan amendments, other than administrative changes discussed above, are <br /> evaluated for re-certification by Facility Management/Coordinator and if deemed <br /> necessary, by a Registered Professional Engineer (PE). PE Plan certification is provided <br /> on the certification page located prior to the table of contents of this Plan. <br /> 1.4.6. Amendment Re-Certification Time Frame <br /> The Coordinator oversees amendments to this Plan within six (6) months, whenever there <br /> is a change in Facility design, construction, operation, or maintenance that materially <br />
The URL can be used to link to this page
Your browser does not support the video tag.