Laserfiche WebLink
01 August 2019 AdvancedGeo <br /> AGE Project No. 05-1278 Environmental <br /> Page 8 of 23 .n 5�' <br /> Tank Type <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Repair Shop Yes <br /> (UL142) <br /> 11 Horizontal AST 280 New Motor Oil Inside Tire Repair Shop Yes <br /> (UL142) <br /> 12 Horizontal AST 150 New Motor Oil Inside Tire Repair Shop Yes <br /> (UL142) <br /> , , <br /> - Steel Drums 55 (x10) Used New OilOil Filters Used OilInside Tire Repair Shop Yes <br /> Steel Drums 55 (x2) Used Oil Filters East of Tire <br /> Repair Yes <br /> Shop <br /> Steel Drums Varies Petroleum product East of Tank Farm Varies <br /> for testing <br /> Approximate TOTAL: 63,430 <br /> 2.10. EVALUATION OF DISCHARGE POTENTIAL <br /> The SPCCP includes an evaluation of any discharge potential to adjoining shorelines <br /> and/or navigable waters. Potential spills are more likely to occur in the outdoor delivery <br /> dock, within the product warehouse or in vehicle parking areas. These potential pollutant <br /> areas are addressed in the appropriate section of this plan. <br />