Laserfiche WebLink
01 August 2019 AdvancedGeo <br /> AGE Project No. 05-1278 Environmental <br /> Page 12 of 23 -� <br /> 3.7.1. Daily Inspection <br /> A Facility employee performs a complete walk-through of the Facility each day. This daily <br /> visual inspection involves: (1) looking for tank/piping damage or leakage, stained or <br /> discolored surface hardscape, or excessive accumulation of water in berm areas and (2) <br /> verifying that the drains are correctly working. <br /> 3.7.2. Monthly Inspection <br /> The checklist provided in Appendix B is used for monthly inspections by Facility <br /> personnel. The monthly inspections cover the following key elements: <br /> Observing AST exterior, pipes, and other equipment for signs of deterioration, leaks, <br /> corrosion, and thinning. <br /> • Observing AST foundations and supports for signs of instability or excessive <br /> settlement. <br /> • Observing AST fill and discharge pipes for signs of poor connection that could <br /> cause a discharge, and AST vent for obstructions and proper operation. <br /> • Observing the constructed secondary containment berm condition. <br /> • Verifying the proper functioning of overfill prevention systems. <br /> • Checking the inventory of discharge response equipment and restocking as <br /> needed. <br /> All problems regarding ASTs, piping, containment, or response equipment are <br /> immediately reported to the Facility Coordinator. Visible oil leaks from AST walls, piping, <br /> or other components are repaired as soon as possible to prevent a larger spill or a <br /> discharge to navigable waters or adjoining shorelines. Pooled oil is removed immediately <br /> upon discovery. <br /> Monthly inspections are documented, and records are signed by the Coordinator and <br /> maintained with this Plan for a period of at least three years, unless otherwise noted. <br /> 3.7.3. Annual Inspection <br /> Facility personnel perform a more thorough inspection of Facility equipment on an annual <br /> basis. This annual inspection complements the monthly inspection described above and <br /> is performed once each year using the checklist provided in Appendix B of this Plan. <br />