Laserfiche WebLink
$2,882.00 per single-family dwelling unit in the Stockton area. The fee shall be <br /> automatically adjusted on July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineering News Record. (Resolutions R-90-304 & R-91-1025) <br /> k. An adjustment to the improvements shall be made to provide for two-way traffic, <br /> temporary cul-de-sacs, and modification of the utility systems to conform to County <br /> standards where the subdivision is to be recorded in phases. (Development Title Section <br /> 9-1100.3) <br /> I. A Preliminary Soils Report is required in accordance with County standards for the <br /> purpose of determining the R-Value for the design of the roads. (Development Title <br /> Section 9-910.2) <br /> M. All utilities shall be underground except power transmission facilities of 35 KV or greater. <br /> Public utility easements shall be provided along the road frontage of the subdivision and <br /> as required by the public utility companies. (Development Title Section 9-1155.2) <br /> n. The subdivider shall agree to and shall pay user fees for the utility services from the time <br /> improvements are accepted by the County until the lots are placed on the County tax <br /> rolls, or up to an 18-month period, as the case may be. (Subdivision Map Act Section <br /> 66493) <br /> o. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control <br /> Devices and San Joaquin County standards, and they shall be shown on the <br /> improvement plans. (Development Title Section 9-1150.2) <br /> P. The Water Supply Facilities Impact Mitigation Fee will be required when the parcels are <br /> developed. The fee is due and payable at the time of building permit application. The <br /> fee currently is$1,142.76 per single-family dwelling unit. If no building permit is required, <br /> the fee will be exempt. The fee shall be automatically increased on January 1 of each <br /> year at the rate of 6.9 percent. An additional 3.5 percent shall be added to the fee upon <br /> payment for processing and administering the program. (Resolution R-91-327) <br /> q. Access rights shall be dedicated and restricted for Lots 1 and 55 along the frontage of <br /> "D" Street. (Development Title Section 9-1150.5) <br /> r. An Offer of Dedication of groundwater rights is required. <br /> 3. PUBLIC HEALTH SERVICES: <br /> a. Connection to a public sewer system is required. (Ordinance Code Section 9-10002) <br /> b. Connection to an approved public water supply system is required. A letter from the <br /> water supplier will be required which states that they have the capacity to serve the <br /> development and that the system meets State standards prior to recording the Final Map. <br /> 4. BUILDING INSPECTION DIVISION: <br /> a. A grading plan shall be submitted by the applicant, and it shall be approved and a <br /> grading permit issued by the Building Inspection Division prior to any excavation of filling <br /> of earth material. <br /> Conditions of Approval - 3 - SU- -1 <br />