My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013124
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
21930
>
2600 - Land Use Program
>
GX-92-9
>
SU0013124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 1:18:43 PM
Creation date
4/13/2020 10:29:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013124
PE
2600
FACILITY_NAME
GX-92-9
STREET_NUMBER
21930
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
RIPON
Zip
95366-
APN
24324008
ENTERED_DATE
3/30/2020 12:00:00 AM
SITE_LOCATION
21930 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CONDITIONS OF APPROVAL <br /> SPRECKELS LAND COMPANY <br /> GX-92-9 <br /> Unless otherwise specified, all Conditions of Approval shall be <br /> complied with prior to commencement of grading and/or excavating. <br /> Section Number or other Statutory <br /> Those conditions followed by a Requirements. Ordinance <br /> Requirement are based on Ordinnance <br /> Requirements cannot be modified. <br /> tified as <br /> The Ordinance Requirements listed below have een encannot be <br /> pertinent to this project. Ordinance Requirements <br /> Requirements may also apply. <br /> modified. Other Ordinance <br /> 18 months from the date of approval. unless <br /> The approval will expire <br /> (1) all Conditions of Approval have been complied with and (2) all <br /> necessary permits from other agencies have been secured and remain <br /> in force. <br /> -DEVELOPMENT SERVICE DIVISION. <br /> The average finished grade elevation shall be lower than <br /> T <br /> a' Title Section 9-222 {b}{4}) <br /> 48 .3 feet. (Planning <br /> b. All Conditions of Approval shall be complied with and grading <br /> shall. have commenced within eighteen (18) months of the date <br /> of approval of GX-92-9 • Excavation <br /> i ghteen (18)final bmo thslo£ <br /> of the site shall.-be completed within e <br /> the start of excavation. <br /> in the <br /> shall be <br /> C. All private roadscontrol involved excavation <br /> he creation of dust (Planning <br /> maintained so as to <br /> Title Section 9-2224{a}) <br /> f. Provide certification of approval of proposed final grades <br /> from the South San Joaquin county Irrigation District <br /> the prior <br /> to authorization being given t <br /> excavation. (Planning Title Section 9-2224{b}{21) <br /> the <br /> g. Excavation operations shall not be carry m °except during <br /> during <br /> hours from nine (9) p.m. through five (5) <br /> state or local emergency. <br /> ared <br /> (Planning <br /> periods ° Title lsection a 912224{d}) <br /> the <br /> s and <br /> h. All emissions shall be sub *Ai tPollutlonleCont oleD strict• <br /> of the San Joaquin county <br /> (Planning Title Section 9-2224{f}) <br />
The URL can be used to link to this page
Your browser does not support the video tag.