Laserfiche WebLink
i <br /> CONDITIONS OF APPROVAL <br /> SPRECKELS LAND COMPANY <br /> GX-92-9 <br /> Unless otherwise specified, all Conditions of Approval shall be <br /> complied with prior to commencement of grading and/or excavating. <br /> Section Number or other Statutory <br /> Those conditions followed by a Requirements. Ordinance <br /> Requirement are based on Ordinnance <br /> Requirements cannot be modified. <br /> tified as <br /> The Ordinance Requirements listed below have een encannot be <br /> pertinent to this project. Ordinance Requirements <br /> Requirements may also apply. <br /> modified. Other Ordinance <br /> 18 months from the date of approval. unless <br /> The approval will expire <br /> (1) all Conditions of Approval have been complied with and (2) all <br /> necessary permits from other agencies have been secured and remain <br /> in force. <br /> -DEVELOPMENT SERVICE DIVISION. <br /> The average finished grade elevation shall be lower than <br /> T <br /> a' Title Section 9-222 {b}{4}) <br /> 48 .3 feet. (Planning <br /> b. All Conditions of Approval shall be complied with and grading <br /> shall. have commenced within eighteen (18) months of the date <br /> of approval of GX-92-9 • Excavation <br /> i ghteen (18)final bmo thslo£ <br /> of the site shall.-be completed within e <br /> the start of excavation. <br /> in the <br /> shall be <br /> C. All private roadscontrol involved excavation <br /> he creation of dust (Planning <br /> maintained so as to <br /> Title Section 9-2224{a}) <br /> f. Provide certification of approval of proposed final grades <br /> from the South San Joaquin county Irrigation District <br /> the prior <br /> to authorization being given t <br /> excavation. (Planning Title Section 9-2224{b}{21) <br /> the <br /> g. Excavation operations shall not be carry m °except during <br /> during <br /> hours from nine (9) p.m. through five (5) <br /> state or local emergency. <br /> ared <br /> (Planning <br /> periods ° Title lsection a 912224{d}) <br /> the <br /> s and <br /> h. All emissions shall be sub *Ai tPollutlonleCont oleD strict• <br /> of the San Joaquin county <br /> (Planning Title Section 9-2224{f}) <br />